The Trakia motorway (, ) or Thrace motorway, designated A1, is a motorway in Bulgaria. It connects the capital city of Sofia, the city of Plovdiv and the city of Burgas on the Black Sea coast. The motorway is named after the historical region of Thrace, the northern (Bulgarian) part of which it spans from west to east. The total length of Trakia motorway is and the final section opened on 15 July 2013 after 40 years of construction.

Trakia motorway connects with the Sofia ring road at its east end, allowing fast access to Hemus motorway (A2) and Struma motorway (A3) via Sofia Northern Bypass motorway (part of Europe motorway, A6).

At its east end, nearby Burgas, Trakia motorway will merge with the planned Cherno More motorway (A5) providing fast access from the south to the city of Varna and the beach resorts on the Black Sea.

Maritsa motorway (A4) branches off at Orizovo Interchange at kilometer 169 to link Trakia motorway with Turkey at the Kapitan Andreevo border crossing. The interchange is situated between Plovdiv and Chirpan, roughly 5 km north of Parvomay.

History The construction of the motorway began in 1973 and the first 10 km from Sofia to Novi Han entered in service in 1978. In 1984 the motorway reached Plovdiv, the second largest city in Bulgaria. In 1995 a 32 km section between Plovdiv and Plodovitovo interchange was completed with EBRD co-financing. In 2000 EIB loan was secured for the construction of two sections, between Orizovo interchange and Stara Zagora (lot 1), and lot 5, between Karnobat and Burgas, fourth largest city, situated at the Black sea coast. The motorway reached Stara Zagora in 2007, and lot 5 entered in service in 2006.

Meanwhile, in 2005 a controversial concession contract was signed by the Bulgarian government and a Portuguese-led consortium. The concession was granted for 35 years without tender procedure and included 433 km from the Serbian border, at Kalotina border checkpoint, to Burgas. However, the contract was cancelled in 2008 and the sections between Stara Zagora and Karnobat (lots 2, 3 and 4) were approved for EU funds financing.

In 2009 and 2010, tenders for the construction of Stara Zagora - Nova Zagora, Nova Zagora - Yambol-west interchange, and Yambol-west interchange - Karnobat sections, totalling 116.8 km, were conducted and contracts were signed. The sections between Stara Zagora and Yambol-east interchange opened to traffic in mid-2012, while the last remaining section between Yambol-east interchange and Karnobat interchange was completed on 15 July 2013.

Exits

Exit km Destinations Lanes Notes 0 Sofia ring road, Tsarigradsko shoseIn service 4,4 Lozen, Ravno poleIn service 5.9 Novi HanIn service 23,3 VakarelIn service 34,3 Ihtiman-northIn service 46,2 Ihtiman-south, KostenetsIn service 54,0 Trayanovi vrata (675 m)In service 60,2 VetrenIn service 68,9 Tserovo, VelingradIn service 79,8 Kalugerovo, DinkataIn service 89,9 Pazardzhik, PanagyurishteIn service 112,3 Tsalapitsa, SaedinenieIn service 118,9 Plovdiv-west, Pamporovo (to and from west only)In service 120,6 Plovdiv-west, Pamporovo (to and from east only)In service 126,1 Plovdiv-northIn service 132,3 Plovdiv-eastIn service 137,2 TrilistnikIn service 150,2 BelozemIn service 164,3 Parvomay, PlodovitovoIn service 168,5 (Haskovo/Dimitrovgrad; Istanbul ; )In service 174,5 Chirpan-westIn service 184,7 Chirpan-east, Stara Zagora-westIn service 208,2 Stara Zagora, Haskovo In service 240 Nova ZagoraIn service 275,4 Yambol-west, SlivenIn service 283 Rest area, KabileIn service 289,4 Yambol-east In service 323,8 KarnobatIn service 351 Balgarovo, Neftochim oil refineryIn service 359 Burgas, Vetren, Aytos In service