New Haven State Street station is a commuter rail station located on State Street in downtown New Haven, Connecticut. The secondary railroad station in the city, it is located northeast of the much larger New Haven Union Station and is intended to offer easier access to New Haven's downtown business district. It is served by CT Rail Shore Line East and Hartford Line commuter trains, Amtrak Hartford Line trains, -terminating trains, and trains, and a limited number of Metro-North Railroad New Haven Line trains. Originally proposed in 1996, State Street opened on June 7, 2002. A second platform opened on June 8, 2018, in time for the beginning of Hartford Line service.
Station design The Northeast Corridor has four tracks at this location, in a shallow cut. From southeast to northwest, the tracks are numbered 1, 2, 4 and 6. State Street has a three-car-long high-level island platform between tracks 4 and 6, and a four car-long side platform serving track 1. Track 2 is used only by trains bypassing the station. The station originally only had the island platform when it opened; the side platform was built for the 2018 opening of the Hartford Line. Because the side platform was not part of the original station, the two platforms are not directly connected and are accessed separately, with two pedestrian bridges, staircases and elevators connecting the platforms to the street-level entrance and busway.
History
A station closer to New Haven's business district than Union Station was first proposed in 1996. The station opened on June 7, 2002, for Shore Line East service, with Metro-North service added on June 24, 2002.
Construction on the second platform began in July 2016, using $10 million in federal funding from a Transportation Investment Generating Economic Recovery grant. The second platform was originally expected to be complete by the end of 2017. The construction of the second platform was paired with security improvements, LED walkway and platform lighting, a sheltered bicycle parking area, platform snow melters, and real-time train information displays. Hartford Line and New Haven–Springfield Shuttle service began on June 16, 2018. Most Shore Line East and all Hartford Line trains (both Amtrak and CT Rail) stop at the station.
CTDOT plans to make additional changes to the station. The Court Street road bridge will be replaced with a -wide pedestrian and bicycle bridge at a cost of $16 million. The existing island platform will be demolished and rebuilt, with connections to both footbridges. It will have of platform face (enough for four cars) on the west side and of platform face (long enough for six cars) on the east side. Cost of the platform work is anticipated to be $97 million. , the Court Street work is expected to last from spring 2027 to mid-2028, with the platform work lasting from spring 2029 to fall 2030.
References
External links
Hartford Line – New Haven State Street Shore Line East – State Street Station
Project No. 0310-0076, Court Street Bridge and State Street Station Improvements