, also known as the , is a manually operated, rubber-tyred people mover operated by Hiroshima Rapid Transit in Hiroshima, Japan. Astram opened on August 20, 1994, for the 1994 Asian Games in Hiroshima. The line connects central Hiroshima and Hiroshima Big Arch, which was the main stadium of the Asian Games.

On March 14, 2015 Shin-Hakushima Station opened to create a second connection between the Astram Line and the JR lines.

History Plans to build a new transit system linking the city centre of Hiroshima with the suburban area to the northwest were first proposed in July 1977.

The third-sector railway company Hiroshima Rapid Transit was founded in 1987, funded primarily by the city of Hiroshima. Groundbreaking for the rapid transit line project began on February 28, 1989, and construction would continue over a five-year period. However, on March 14, 1991, 14 people were killed when a girder collapsed on a section of the line's elevated viaduct near the station's construction site. The line opened for revenue service on August 20, 1994. Because the line operates underground, train staff would need to be onboard to guide passengers to safety, the line was made manually operated.

When the line originally opened in 1994, it had 21 stations, of which provided the line's only transfer with a JR West line (the Kabe Line). On March 14, 2015, opened as an infill station between Hakushima and Jōhoku in order to provide a transfer point with the Sanyo Main Line.

In January 2025, the line announced fare increases of up to ¥30 per ride. This is the first fare increase (except for the addition of sales tax as sales tax laws changed) in the over 30 years since the line opened in 1994. These fare increases will take effect from October 2025.

Stations

Station Distance in km (mi) Transfers LocationBetweenstationsTotal Hiroden Ujina Line (at Hondori)Naka-ku Higashi-kuAsaminami-ku  Kabe Line   

Rolling stock 7000 series 6-car EMUs (24 sets; 2020–present)

, services on the line were operated using a fleet of 23 six-car 6000 series trainsets (sets 01 to 23) and three six-car 7000 series (sets 31 to 33).

The entire fleet of 24 1000 and 6000-series sets was replaced with a new fleet of six-car trains delivered in two batches. The first of 24 new 7000 series sets was delivered in October 2019 and entered service in March 2020. The lone 1000 series set was retired in June 2020.

The 6000 series was withdrawn from service following a special final run on 18 May 2025. 7000 series

The 7000 series trainsets (31 to 54) are formed as follows, with all cars motored. Designation Mc M M M M Mc Numbering 71xx 72xx 73xx 74xx 75xx 76xx Priority seating is provided in each car, and wheelchair spaces are provided in the end cars.

Former rolling stock

6000 series

The 6000 series trainsets (01 to 23) were formed as follows, with all cars motored.

Designation Mc M M M M Mc Numbering 61xx 62xx 63xx 64xx 65xx 66xx

Priority seating was provided in each car, and wheelchair spaces were provided in the end cars.

1000 series The 1000 series trainset (24) was formed as follows, with four of the six cars motored.

Designation Tc M M M M Tc Numbering 1124 1224 1324 1424 1524 1624

Priority seating was provided in each car, and wheelchair spaces were provided in the end cars.

See also List of rapid transit systems Medium-capacity rail system

References

External links

Map of Hiroshima rail transit network