The M35 motorway () is a motorway in eastern Hungary which connects the M3 motorway with the city of Debrecen, providing it with a direct motorway link to the capital, Budapest.

The section bypassing Debrecen was completed in April 2006, and the whole stretch of road was opened to the public on 15 December 2006. The new road reduced driving time between Debrecen and the capital to under 2 hours. The further stretch from Debrecen to the M4 motorway was inaugurated on December 20, 2018.

Timeline SectionLengthOpenedNotesGörbeháza (M3) – Debrecen dél 15 December 2006 Built between 2003 – 2006, with Debrecen western bypass.Debrecen dél – Mikepércs 13 December 2017 Built between 2015 – 2017.Mikepércs – Berettyóújfalu (M4) 20 December 2018 Built between 2015 – 2018.

Route description The route is full length motorway. The maximum speed limit is 130km/h, with (2x2 lane road with stop lane).

CountykmTypeDestinationNotesHajdú-Bihar 0 – Budapest, Miskolc (M30)

– NyíregyházaThe northern terminus of the motorway, E79 route, and Via Carpathia.

Kilometrage starting point

trumpet interchange 7 Pródi pihenőhely parking, and WC

pihenőhely means Rest area 12 Eastern Main Channel híd híd means Bridge 14 Hajdúnánás / Balmazújváros 19 Böszörményi pihenőhely parking, and WC 24 Hajdúböszörmény / Balmazújváros Connection to the highway engineers 31 Józsai pihenőhely parking, petrol station (Mobil Petrol), café and restaurant 33 BMW factory, Gate 1. and 6. / Debrecen-Józsa exit under construction 38 BMW factory, Gate 2. / – Debrecen észak, towards to Main road 4 → Nyíregyháza Northern end of concurrency with European route E573, and Debrecen bypass.

cloverleaf interchange (formerly trumpet interchange when opened)

észak means North Main road 33 – Debrecen Centrum / Hortobágy Centrum means center 40 Debrecen nyugat, Debrecen-Ondód, Ipari park nyugat means West

Ipari park means Industrial area 44 Main road 4 – Debrecen dél – Hajdúszoboszló, Szolnok Southern end of concurrency with european route E573.

dél means South 49 Main road 481 – Mikepércs, Industrial area Southern end of Debrecen bypass.

Connection to Debrecen International Airport 53 Mikepércsi pihenőhely parking, and WC 60 Derecske / Hajdúszovát 63Derecskei pihenőhely parking, and WC (petrol station in the future) 68 – Budapest, Szolnok

– Nagykereki → Oradea (RO)The southern terminus of the motorway, E79 route, and Via Carpathia.

Incomplete junction: junction only from/to → Nagykereki (Romanian border)

Maintenance The operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc. This activity is provided by this highway engineer. near Hajdúböszörmény, kilometre trench 22

Payment Hungarian system has 2 main type in terms of salary:

1, time-based fee vignettes (E-matrica); Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.

2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers: {| class="wikitable"Type of county vignette Available sectionHajdú-Bihar full length (0 km – 68 km)

European Route(s) Name Route68 km junction (0) – junction (68)17 km Debrecen-dél (44) – Debrecen-észak (37)

See also

Roads in Hungary Transport in Hungary International E-road network

References

External links

Exit list of M35 National Toll Payment Services Plc. (in Hungarian, some information also in English) National Infrastructure Developer Ltd.