The Gawler line (also known as the Gawler Central line) is a suburban commuter railway line in the city of Adelaide, South Australia. It is the most frequent and heavily-patronised line in the Adelaide rail network. It is also the only line to have no other interchange with another line, except for Adelaide station.

History

The line was opened in 1857 from Adelaide to Gawler.Bassett Town & the Railway Town of Gawler It was extended to Kapunda in 1860. Branches were later built from Gawler to termini in Angaston, Truro, Morgan, Robertstown, Peterborough, Spalding and Gladstone. Between Adelaide and Salisbury, the two broad gauge lines are paralleled by one standard gauge line on the Adelaide to Port Augusta line. A little north of Salisbury the standard gauge line heads north-west. From Salisbury to Gawler there are two broad gauge tracks, with a single broad gauge track north of Gawler.

Renewal and electrification In 2008, the State Government announced a plan to rebuild the Gawler line, in preparation for the line to be electrified with the federal government also to provide funding.2008/09 State Budget South Australian Department of Treasury & Finance June 2008 The track was removed, and the track bed, sleepers and track renewed. Dual gauge sleepers were laid to allow for the line to be converted to standard gauge at a future date. The line was closed between North Adelaide and Mawson Interchange for four months from June 2010 for this work to be performed, and between Mawson Interchange and Gawler Central stations for seven months from September 2011.Gawler Line Reconstruction Coleman RailGawler Line timetable Adelaide MetroRail Revitalisation Gawler Line Department for Transport, Energy & Infrastructure Following the withdrawal of federal government funding by the then newly elected Abbott Liberal-National government, the electrification was postponed in October 2013.Federal Government pulls plug on $76m Gawler Line electrification Adelaide Advertiser 24 October 2013

In February 2011, a new Adelaide Metro railcar depot opened to the east of Dry Creek station, to replace the facility behind the new Royal Adelaide Hospital site and Adelaide station.Railcar Depot Relocation Department of Planning, Transport & Infrastructure The depot is the major maintenance and re-fuelling facility for the diesel train fleet, with capacity to store 70 railcars with over 11 kilometres of track. The depot has been designed to allow future conversion to support electric rolling stock.

To facilitate work on the Torrens Rail Junction in 2017, the Gawler line between Adelaide and Mawson Interchange was closed from 1–15 October and 18 November to 5 December.

Following a decade of on-again, off-again talks, electrification of the Gawler line was announced in 2018. The announcement only promised Stage 1 electrification as far as Salisbury with works anticipated to commence in 2018. A $220 million grant from the federal government allowed for Stage 2 electrification for the remainder of the line to proceed. Works began in November 2019 with completion anticipated in 2021. Contrary to the Seaford line electrification, which saw the line closed completely for 11 months, from October 2020 onward, main construction on the Gawler line was spread out across a rolling schedule of partial and full line closures across 12 months. Early works before October 2020 were spread across smaller closures, typically at nights and on weekends.

The entire line was closed in December 2020. It was intended to reopen in November 2021 but was delayed due to restrictions regarding the COVID-19 lockdown in July. The line was expected to reopen around 30 April 2022, but following the state election in March, the reopening was pushed back to the end of June.

The line was reopened on 12 June 2022. A majority of services on the line are now operated by 4000 class trains, however, 3000/3100 class trains continued to operate select services while the delivery of new 4000 class train sets continued until December 2023 when the last 4000 class set was delivered, effectively replacing the 3000 trains serving Adelaide's north.It’s electrifying! Journey’s end for Gawler line project

Torrens Road Overpass In 2021, the Australian and South Australian governments announced that the Torrens Road level crossing would be removed, at a cost of $196 million. The Torrens Road level crossing was previously identified as one of the most high risk crossings in Adelaide, in part due to it being both a passenger rail, and freight rail crossing. Earlier, in 2020, an investigation was launched after a freight train passed through the level crossing without activating the crossing boomgates.

In 2023, the Torrens Road overpass was officially opened. As part of the project, a new public park was constructed underneath the overpass, and the adjacent Ovingham railway station was rebuilt.

Possible extension On 16 March 2025, South Australian Premier Peter Malinauskas announced that the corridor of the former Morgan railway line has been reserved for a possible future extension of the Gawler line to Roseworthy, along with a branch line to Concordia via the disused Barossa Valley railway line, which closed in 2014.Greater Adelaide Farmland Proposed Rezoning SA Housing, ABC News Australia

Former branch lines Dry Creek-Port Adelaide railway line: opened 1868 (closed to passengers 1988, now freight only) Northfield railway line: opened 1857 (closed to passengers 1987, closed to remaining freight 1995) Port Pirie railway line: (closed to passengers 1991, now freight only) Penfield railway line: opened 1941 (closed 1991) GMH Elizabeth railway line: opened 1959 (closed 1992)

Route The line runs from Adelaide station north via Prospect, Mawson Lakes, Salisbury, Elizabeth and Smithfield to the town Gawler on the outer northern metropolitan fringe. The line is in length and is the longest of the Adelaide suburban railway lines.

Like the rest of the Adelaide suburban passenger rail network, the line is broad gauge for its entire length. The Australian Rail Track Corporation's standard gauge Adelaide to Port Augusta line runs parallel to the route from the Adelaide Gaol triangle to Salisbury, then turns north west towards Virginia.

Line guide Gawler LineNameDistance fromAdelaideYear openedServing suburbsConnections0.0 km1856Adelaide Bus Tram2.5 km1857North Adelaide3.6 kmOvingham, Renown Park4.9 km1915Dudley Park, Prospect6.0 kmDudley Park, Prospect7.7 km1915Kilburn10.6 km1856Dry CreekMawson Interchange14.3 km2006Mawson Lakes Bus Interchange15.1 km1969Parafield Gardens16.6 km1968Parafield Gardens17.7 km1928Parafield, Parafield Gardens18.6 kmSalisbury Downs, Salisbury South20.2 km1856Salisbury Bus Interchange21.5 km1950Elizabeth South, Salisbury24.0 km1955Elizabeth South25.8 km1960Elizabeth Bus27.3 km1950Edinburgh North, Elizabeth North28.2 kmDavoren Park, Elizabeth North30.2 km1857Smithfield Bus Interchange32.2 km1978Munno Para Bus34.1 km1959Kudla37.4 km1947Evanston Gardens38.3 kmEvanston39.3 km1913Evanston39.8 km1857Gawler South, Gawler West Bus Regional Coach 41.4 kmGawler42.2 km1911Gawler

Services Commuter All suburban rail passenger services are operated by Adelaide Metro. In April 2008, new timetables were introduced on the Gawler line in an effort to boost efficiency. Shorter secondary services that terminated at Dry Creek and Salisbury were withdrawn, new limited express services were introduced, and a new Hi-Frequency station policy adopted.Gawler timetable Adelaide Metro, 4 February 2013 Nearly all services either start or terminate their journey at Gawler or Gawler Central stations, apart from a morning peak express service that begins its journey at Salisbury.

Under this policy, the Hi-Frequency stations (Islington, Mawson Lakes, Parafield, Salisbury, Elizabeth, Smithfield, Tambelin and Gawler) have services every 15 minutes from Monday to Friday. All other stations have a 30-minute service, obtained by every other service skipping that station. This is in addition to several peak hour express services that stop only at selected Hi-Frequency stations.

On weekends and public holidays, services operate with a 30-minute frequency at all stations, with the exception of stations between Dry Creek and Adelaide, which are hourly instead.

Until April 2008, most services along the line were operated by 3000 class railcars. With the introduction of the new timetable, 2000 class railcars became more frequent, especially during peak hour. The 2000 class railcars were retired in August 2015."Limited life for 2000 class Jumbo railcars" Railway Digest January 2015 page 20

Freight Freight is a major factor along this transport corridor, with the Australian Rail Track Corporation's standard gauge Adelaide to Port Augusta line running parallel to the broad gauge track between Adelaide and Salisbury. Since 1984, this line has been standard gauge and had no interface with the suburban lines. Bowmans Rail, One Rail Australia, Pacific National, SCT Logistics, and Journey Beyond operate services via the line. Journey Beyond operates The Ghan and the Indian Pacific passenger trains along this section. Until 2007, grain trains operated from Roseworthy to Port Adelaide. The last freight service on the Gawler line was the Penrice Stone Train, which operated to Penrice until it ceased operating in June 2014.Penrice soda ash plant at Osborne closing ABC News 25 June 2014

References

External links Gawler Central to City – Adelaide Metro website Gallery of track refurbishment work: Adelaide to Mawson Interchange 2010 Johnny's Pages Gallery of track refurbishment work: Mawson Lakes to Gawler 2011 Johnny's Pages Gallery of track refurbishment work: Mawson Lakes to Gawler 2011–2012 Johnny's Pages Gallery of track refurbishment work: Gawler to Gawler Central 2012 Johnny's Pages Gallery of electrification work: Adelaide to Gawler 2012 Johnny's Pages