The Line 6 of Ningbo Rail Transit () is a rapid transit line in Ningbo, Zhejiang. It starts from to with 23 stations in operation, spanning 39.6 km long. Construction started on 28 December 2022 with a total investment of 31.53 billion RMB.

Opening Timeline SegmentCommencementLengthStation(s)Name Gulin — Honglian 16 January 2026 23 Phase 1

Stations All 23 stations are underground.

The intervals is 6 minutes during peak hours, 8 minutes during off peak hours and 10 minutes in normal hours.

When line 6 started its operation, due to the passageway directly connecting 2 lines at and not being opened, transfer outside the station area is required. If using following QR code channels, Ningbo Rail Transit App, WeChat Pay, Alipay, passengers must transfer within 30 minutes once they exit from one of the 2 stations. For passengers using single journey tickets or other IC cards, a "Ride Ticket" can be received when swiping their cards to leave the gate, and continue to the next trip with the "Ticket". On 1 June 2026, the transfer passageway of Zhengda Road was opened for service.

OSI: Out of System Interchange Station name Transfer Service pattern Distance Location ●●0.000.00 Haishu● -● -● -● -● -●●●● (currently OSI) ●●● -●● Jiangbei●●● - Yinzhou●●● -● -Yuanshi Road院士路● -● -● -● - Beilun● -● -●●39.60

Commemorative Products To celebrate Line 6 opening on 16 January 2026, Ningbo Rail Transit sold limited-edition commemorative tickets. Each person can only buy 2 sets, with each set consisting of 2 commemorative tickets, per day. Each ticket has only 15 rides total. In parallel with sold commemorative ticket sets, Ningbo Rail Transit also sold building blocks which look similar to the appearance of the Line 6 train. The building blocks are divided into 2 sets: Mini train and Small train.

References