Line 6 of Hefei Metro () is the seventh metro line in operation of Hefei Metro system. Construction started on 31 October 2020 with an investment of 20.585 billion RMB, the first phase opened on 26 December 2025 at 10:00 am with 21 stations in operation, spanning 34.43 km long. As the second line of Hefei Metro system, and also in Anhui province that is a fully automated line (after Line 8), Line 6 adopts GoA4 automation level, which has the highest automation level in the world.

Stations

All 22 stations are underground. Station name Connections Distance Location ~~Shushan~~~~~~~~~~~~~~~~~~~~~~Baohe~~~~~~~~~~Yaohai~~~~~~~~~~Feidong County

References