The 19623/19624 Madar (Ajmer)–Darbhanga Amrit Bharat Express is India's 14th Non-AC Superfast Amrit Bharat Express train, which runs across the states of Rajasthan, Uttar Pradesh & Bihar by connecting Madar (Ajmer) and Darbhanga via , , , & .

The train will inaugurate on 29 September 2025 by Prime Minister Narendra Modi via video conference from New Delhi, India.

Overview

The train is operated by Indian Railways, connecting Madar () and . It is currently operated with train numbers 19623/19624 on weekly basis.

Rakes It is the 14th Amrit Bharat 2.0 Express train in which the locomotives were designed by Chittaranjan Locomotive Works (CLW) at , West Bengal and the coaches were designed and manufactured by the Integral Coach Factory at , Chennai under the Make in India initiative.

Services The 19623/19624 Madar (Ajmer) – Darbhanga Junction Amrit Bharat Express currently operates 1 day in a week, covering a distance of 1305 km (810 mi) in a travel time of 27 hrs 30 mins with an average speed of 47 km/h (29.2 mph). The Maximum Permissible Speed (MPS) is 130 km/h (81 mph).

Routes & halts The halts for this 19623/19624 Madar Junction (Ajmer) – Darbhanga Junction Amrit Bharat Express are as follows:-

See also Amrit Bharat Express Vande Bharat Express Rajdhani Express Madar Junction Darbhanga Junction railway station

References