The 15561/15562 Darbhanga–Gomti Nagar (Lucknow) Amrit Bharat Express is India's 5th Non-AC Superfast Amrit Bharat Express train, which currently runs across the states of Bihar and Uttar Pradesh by connecting the municipal corporation city Darbhanga with the capital city of Uttar Pradesh, Lucknow in India.
This express train was inaugurated on 18 July 2025 by Prime Minister Narendra Modi.
Overview This train currently operated by Indian Railways, connecting and . It is currently operated with train numbers 15561/15562 on Weekly services.
Rakes It is the 3rd Amrit Bharat 2.0 Express train in which the locomotives were designed by Chittaranjan Locomotive Works (CLW) at Chittaranjan, West Bengal and the coaches were designed and manufactured by the Integral Coach Factory at Perambur, Chennai under the Make in India initiative.
Service The 15561/15562 Darbhanga – Gomti Nagar Amrit Bharat Express currently operates Weekly, covering a distance of in a travel time of 14hrs 35mins with average speed of 54 km/h. The Maximum Permissible Speed (MPS) is .
Routes and halts The halts for this 15561/15562 Darbhanga – Gomti Nagar (Lucknow) Amrit Bharat Express are given below:-
Rake sharing The train shares its rakes with 15557/58 Darbhanga–Anand Vihar Terminal Amrit Bharat Express.
See also
Amrit Bharat Express Darbhanga–Anand Vihar Terminal Amrit Bharat Express Vande Bharat Express Tejas Express Gatimaan Express Darbhanga Junction railway station Gomti Nagar railway station
References