The Bung–Van Ninh Expressway (Vietnamese: Đường cao tốc Bùng–Vạn Ninh) is a section of the North–South Expressway East and the North–South Expressway West located in Quảng Trị province.

Design The route has a total length of 48.84 km, the starting point of the road is connected to Vung Ang–Bung Expressway in Bố Trạch commune, Quảng Trị provinceand the end point is in Trường Ninh commune, Quảng Trị province connect with Van Ninh–Cam Lo Expressway currently under construction. The project has a divergent phase cross-section that meets the standards of a 4-lane highway without an emergency lane, with emergency stops arranged every 4–5 km/point with a roadbed width of 17m, and a design speed of 90 km/h. In the completed phase, the road will have 6 lanes, 32.25m wide, with 2 emergency lanes, and a design speed of 100 km/h.

Construction The route has a total investment of VND 9,361 billion, and was started on January 1, 2023. The expected construction time is 34 months. The project is expected to be completed and put into use on April 30, 2025.

Route details Lanes 4 lanes, with emergency stops every 4–5 km/point

Length Total route: 48.84 km

Speed limit Maximum: 90 km/h Minimum: 60 km/h

List of interchanges and features

IC - interchange, JCT - junction, SA - service area, PA - parking area, BS - bus stop, TN - tunnel, TB - toll gate, BR - bridge

{| class="wikitable" style="font-size: 90%; text-align: center;" |- style="border-bottom:solid 0.25em green;" !No. !Name !Dist. fromOrigin !Connections !Notes ! colspan="3" |Location |- !colspan="8" style="text-align: center;"| Connect directly with  Vung Ang–Bung Expressway |- !style="background-color: #BFB;"|1 |style="background-color: #fafafa;"|Cự Nẫm IC |style="background-color: #fafafa;"| 626.7 |style="background-color: #fafafa;"|Ho Chi Minh Highway |style="background-color: #fafafa;"| |rowspan="6"|Quảng Trị |Bố Trạch |- !style="background-color: #BFB;"|2 |style="background-color: #fafafa;"|Việt Trung IC |style="background-color: #fafafa;"| 643.5 |style="background-color: #fafafa;"|Provincial Road 563 |style="background-color: #fafafa;"| |Nam Trạch |- !style="background-color: #BFB;"|SA |style="background-color: #fafafa;"| Service Area km651 |style="background-color: #fafafa;"| 651 |style="background-color: #fafafa;"| |style="background-color: #fafafa;"| | rowspan="2"|Đồng Sơn |- !style="background-color: #BFB;"|3 |style="background-color: #fafafa;"|Nhật Lệ 2 IC |style="background-color: #fafafa;"|Ho Chi Minh Highway and National Route 1 |style="background-color: #fafafa;"| |- !style="background-color: #BFB;"|BR |style="background-color: #fafafa;"|Long Đại Bridge |style="background-color: #fafafa;"| ↓ |style="background-color: #fafafa;"| |style="background-color: #fafafa;"|Long Đại river pass | rowspan="2"|Trường Ninh |- !style="background-color: #BFB;"|4 |style="background-color: #fafafa;"|Vạn Ninh IC |style="background-color: #fafafa;"| 674.6 |style="background-color: #fafafa;"| National Route 9B |style="background-color: #fafafa;"| |- ! colspan="7" style="text-align: center; background:#dff9f9;"|Connect directly with  Van Ninh–Cam Lo Expressway

References