The Um-Dabakir Power Station () is a power station in Rabak, White Nile State, Sudan. It is the largest thermal power station in the country.
History The power station was constructed by Bharat Heavy Electricals Limited. It was commissioned in February 2016 in a ceremony officiated by President Omar al-Bashir. The ceremony was attended by senior officials and representative of the Indian Embassy in Sudan.
Technical specifications The power station consists of four generation units. Each unit is rated 125 MW. With a total generation capacity of 500 MW, it is the largest power station in Sudan.
Finance The power station was constructed with a cost of US$457 million. A total of US$350 million of it was financed by credit by Exim Bank of India.
See also List of power stations in Sudan
References