Ermont Eaubonne to Champ-de-Mars line, also known as the Vallée de Montmorency - Invalides (VMI) line, is a French railway line in the Île-de-France region, part of the RER C line. It connects the Champ de Mars - Tour Eiffel station in Paris with the Ermont - Eaubonne station in the Val-d'Oise department, fifteen kilometers north of the capital. It forms line n° 962 000 of the national rail network.
The VMI brings together two old lines with specific histories: the Auteuil line, which became part of the Petite Ceinture line within Paris, and the line from La Plaine to Ermont-Eaubonne, the Grésillons line. The VMI project, developed in 1977, was designed to replace the significant north-south RER transversal planned in the 1965 SDAU. The line was inaugurated on September 25, 1988, after three years of construction and a complicated gestation period marked by technical difficulties and strong opposition from residents. It is served by Z 2N railcars, with a service frequency of four trains per hour in each direction during off-peak hours and eight trains per hour during rush hours, with freight traffic mainly serving the port of Gennevilliers.
Technical data
Layout The fully double-track line branches off from the line between Les Invalides and Versailles-Rive-Gauche at Champ de Mars - Tour Eiffel station in Paris. It then runs northwest to Ermont-Eaubonne, which it reaches after crossing the 16th and 17th arrondissements of Paris and the capital's northern suburbs. At this station, it joins the Saint-Denis to Pontoise line of the Nord network.
Features
The line is electrified at two voltages. Like the entire northern network, the north section is supplied with 25 kV-50 Hz single-phase as far as Saint-Ouen (separation section north of the station) by the Saint-Denis-La Briche substation, which is remotely controlled by the central Paris-Nord substation. The Paris section of the VMI is supplied with 1,500 V by the Pereire substation, commissioned on August 18, 1988. It is fully equipped with BAL, speed control by beacons (KVB), and a ground-to-train radio link with data transmission from Paris to Ermont-Eaubonne and, without data transmission beyond, to Pontoise.
History
Lines integrated into the VMI
Auteuil line
The Auteuil line, which connects Gare Saint-Lazare with Auteuil-Boulogne, was developed by the Pereire brothers, who had previously constructed the line from Paris-Saint-Lazare to Saint-Germain-en-Laye. The Compagnie des chemins de fer de l'Ouest commissioned the line on May 2, 1854, to accommodate sustained urban traffic. In 1867, the line became part of the Petite Ceinture line, which connected to the Auteuil-Boulogne station via the Auteuil and Point-du-Jour viaducts. In 1869, the Courcelles connection was opened between the Courcelles-Levallois and Avenue de Clichy stations, completing the Petite Ceinture by linking the Auteuil line to the right-bank Ceinture.
Saint-Ouen-les-Docks line By decree of November 21, 1873, the Compagnie des chemins de fer du Nord took over the concession of the line from the Compagnie du chemin de fer and des docks de Saint-Ouen.
Grésillons line
The Ermont-Eaubonne-Plaine-Gare du Nord line via Gennevilliers was built in 1905 and inaugurated on July 1, 1908, with two connections. The passenger buildings' large dimensions and elegant architecture were carefully constructed. From September 25, 1977, the trains' terminus was limited to Saint-Ouen-Garibaldi to allow the reorganization of the Paris-Nord line, which was linked to the construction of the future RER underground station and the north–south link.
Ermont - Eaubonne to Champ de Mars line
The VMI project The 1965 SDAU sketch of the future Réseau Express Régional (RER) included a north–south transverse line connecting Saint-Quentin-en-Yvelines to Cergy-Pontoise via Montparnasse and Saint-Lazare stations. Because of its cost, this link was eventually abandoned, and service to Cergy from Saint-Lazare was provided by a new line branching off at Neuville-sur-Oise. The Montmorency Valley, an urbanized area of 250,000 inhabitants north of Paris, remained without an efficient RER-type service. In the mid-1970s, three lines were studied:
Saint-Lazare - Argenteuil - Sannois - Ermont-Eaubonne line. La Défense - Colombes - Ermont-Eaubonne line. RER Line C branch line using abandoned or underused infrastructure between Champ-de-Mars station and Ermont-Eaubonne.
The SNCF developed the VMI project at the beginning of 1977. It was presented to and approved by the Parisian Transport Authority (STP) on September 28, 1977, as a major project under the Special Program. The planned new link includes most of the Ermont- Saint-Ouen-les-Docks line in the north and the Auteuil line in the south. It essentially uses the existing lines, which will be modernized, with the reactivation of the neutralized Boulainvilliers line and the Courcelles line, as well as the construction of a new line at Les Épinettes - the only new section - to connect Petite Ceinture to the Docks line. According to initial studies, the line will be used by forty-five million passengers annually, with an average time saving of eight minutes per journey. It is also estimated that 3,700 users would switch from car to train.
Obstacles With the STP's approval, the SNCF could have submitted the project directly to the public utility inquiry. However, due to the public outcry concerning the planned overhead route through the Épinettes district, the SNCF revised the project before submitting it to the inquiry and declaration of public utility at the beginning of 1980. The revised route, which would run in a glass tunnel, was less favorable but would eliminate noise pollution for residents. The City of Paris then expressed concerns about the project, particularly the glass tunnel, which it felt might disrupt the urban fabric. It also requested the covering of the Pereire trench, an idea that had been discussed for some time, as it would enable the city to reclaim surface rights-of-way.
In the spring of 1980, the City of Paris recommended a light covering of the Pereire trench. It rejected the overhead glass tunnel in favor of an underground route at Les Épinettes, which forced the SNCF to revise its plans quickly.
The additional cost of 110 million francs associated with the underground route was a significant concern, prompting public authorities to consider canceling the project. Ultimately, several measures were implemented to mitigate the cost overrun. The development of the underground Porte de Clichy station had been put on hold. Additionally, the SNCF was obliged to sell the Petite Ceinture platform between the Batignolles junction and Boulevard Berthier, which was decommissioned and sold to the City of Paris. This decision has the unfortunate consequence of creating a definitive break in the layout of the Petite Ceinture. The proceeds from selling the Courcelles connection to the City of Paris were transferred to the VMI budget to finance a heavy cover for the Auteuil line. Finally, the decision was made to remove the electrification of the Ermont-Argenteuil branch from the VMI budget and charge it to the suburban network budget. The declaration of public utility was pronounced on September 25, 1981, before the legal deadline for the inquiry.
However, just as the project was nearing completion, the town of Saint-Ouen-sur-Seine expressed its desire for the line to be constructed underground through the commune. With the support of the then Minister of Transport, the Communist Charles Fiterman, the town could force the SNCF to re-examine its project. This resulted in constructing a new station entirely underground, with the route crossing the town via a cut-and-cover method. The project was finally approved in September 1984.
The demands of residents resulted in a tripling of the cost in constant francs, a six-year delay, and an exceptionally mediocre layout and profile, which fell far short of the standard applied to the new infrastructure of RER lines A and B. For instance, inter-station speeds in Paris are restricted to 60 or even 40 km/h, rather than the anticipated 90 km/h. The original plan for the Porte-de-Clichy and Saint-Ouen stations was to construct them at the top of a ramp; however, they now sit in a bowl surrounded by steep ramps, with some reaching 40%.
Construction site The modernization of the short Ermont-Argenteuil section with 25 kV electrification was completed ahead of schedule in May 1983 with minimal difficulties. Modernizing the line from La Plaine to Ermont-Eaubonne was a more time-consuming process due to the poor condition of the infrastructure, which was incompatible with a modern interval service. As a result, the entire infrastructure had to be completely upgraded. In 1983, the rail bridges were restored, and the Épinettes junction was removed to construct a cut-and-cover tunnel on the right-of-way. In 1984, the track was entirely replaced from Ermont to Saint-Gratien, with alterations to the track configuration at Ermont-Eaubonne station. In 1985, the section from Saint-Gratien to Saint-Ouen was modernized.
The standardized Lartigue Nord block, which was still in place from Gennevilliers to Ermont, was replaced by the automatic lighted block (BAL), which had already been installed on the Gennevilliers to La Chapelle section for the creation of the Saint-Ouen Garibaldi station. The route is equipped with two permanent counter-sense installations (IPCS) and a PRCI-type signal box, which was established at Gennevilliers during the summer of 1987. At the same time, all passenger buildings underwent extensive modernization or reconstruction, with complete renovation of platforms, lighting, shelters, and signage. In 1986, Gennevilliers station was rebuilt 500 m further south to improve connections with other modes of transport, particularly with a potential TCSP between Saint-Denis and Asnières - Gennevilliers. A new passenger building was constructed at Les Grésillons, and a grade separation was built at Saint-Ouen.
The work in Paris presents a particularly delicate challenge. The subsoil is crisscrossed by many different pipes and conduits, which presents a challenge to the work. The reused section of the Auteuil line underwent a complete renovation. The tracks were removed and replaced, the platforms were rebuilt, and the open-air sections were covered with a concrete slab to mitigate noise pollution for residents. However, as A. Jacquot notes, the slabs currently in place around the Avenue Henri-Martin station are utilized as parking lots, which raises concerns about the potential impact of car traffic on the surrounding area. The passenger buildings and underground corridors are undergoing a complete restoration process.
A double-track tunnel is being constructed between the Docks and Auteuil lines. A site has been earmarked for the future construction of Porte de Clichy station. The only remaining component of the Courcelles-Ceinture station between Pereire-Levallois and the Berthier bridge was a single track known as the "voie des Souverains." Following the real estate development along the platform in the 1950s, insufficient space remained to accommodate a UIC-gauge double track, with only fifty centimeters of clearance to provide the necessary width. This lack of foresight resulted in the necessity for extensive work, which commenced in October 1984 and continued until May 1985. To accommodate the electrification gauge, the invert had to be lowered, and the trench had to be widened by rebuilding the old inclined wall. In 1987, the open-air section west of the Berthier bridge was covered with a soundproofing slab used as a parking lot.