The M3 line, also referred as Menderes–Konak Line () is a planned ATO rapid transit line in İzmir, Turkey. The line has a total length of and would begin at Konak and run south into Menderes. When completed, the line will become the second driverless metro line in İzmir, after the M2 line.

History A tender was awarded in December 2019 for the implementation of the project of the line. The introductory meeting of the line, which will cost 2.105 billion euros, was held on 31 January 2023.

Stations The line will consist of eighteen stations, of which fifteen are new and three (Fuar İzmir, General Asım Gündüz and Konak) will connect to the existing lines. The list of stations are as follows: Menderes Görece Menderes Sanayi Adnan Menderes Airport Gaziemir Güvenpark Gaziemir Stadyum Abdullah Arda Gaziemir Kaymakamlık ESBAŞ Fuar İzmir Altan Aydın Atatürk Anadolu TML Dostluk Bulvarı Seniha Mayda Eski İzmir Çalıkuşu General Asım Gündüz Konak

References