The RECIP IV Power Station is a diesel fuel power station in Oranjestad, Aruba.

History In December 2018, the contract to construct the power station was awarded to Wärtsilä. The construction of the power station started in 2020. The power station was then commissioned in June 2022.

Technical specifications The power station has six generating units with a total installed generation capacity of 102 MW.