The GSLV F12 is the 15th flight of the GSLV and the 9th flight of Mk2 variant using indigenous Cryogenic engine.
Launch Launch of GSLV F12 / NVS 01 Mission is Tentatively Scheduled for Monday, 29th May 2023 at 0512 hrs UTC from Satish Dhawan Space Centre, Second Launch pad, Sriharikota Andhra Pradesh, India as Per Notam .
Mission overview
Primary payload: NVS-01
This also marks the 15th time that Geosynchronous Satellite Launch Vehicle will be launching the Satellites.
This Launch Vehicle is an 3 Stage Launch Vehicle. The first stage of GSLV was also derived from the PSLV's PS1. The 138 tonne solid rocket motor is augmented by 4 liquid strap-ons which is Powered by Vikas (rocket engine).
+Launch Vehicle Stages Stage Propellant TypeMax. ThrustBurn TimeGS1Solid4800 kN100 SecGS2Liquid846 kN150 SecCUSLiquid 75 kN814 sec
References