The Breagh gas field is a natural gas reservoir and production facility in the UK sector of the southern North Sea. It is about 100 km of east of Teesside and started gas production in 2013.

The field The Breagh field extends over UK offshore Blocks 42/13a and 42/12a. The field was discovered in July 1997 by well 42/13-2. The reservoir is a Lower Carboniferous Sandstone formation and has reserves of 600 billion cubic feet.

The Breagh gas field is jointly owned by INEOS (70%) and Sterling Resources (30%), INEOS operates the infrastructure. RWE Dea was the original 70% owner and operator but this interest was transferred to INEOS in 2015.

Development Production from the field is developed in stages. In the first stage gas is produced by wells on the offshore platform Breagh Alpha and then via pipeline to the Teesside Gas Processing Plant at Seal Sands. Later stages will entail development of the eastern part of the field produced back to a new Breagh Bravo platform.

Details of the Breagh A field infrastructure are as shown. +Breagh A installationPlatform nameBreaghInstallation typeFixed Steel platformCoordinates54°42’21”N 00°26’09”EFunctionIntegrated minimum facilities wellhead and productionCrewNot permanently attendedPlatform installedOctober 2011First gasOctober 2013Water depth, metres62Design and ConstructionHeeremaa Vlissingen, NetherlandsJacket weight, tonnes2,300Topsides dimensions, metresTopsides weight, tonnes1,200No. of legs4 (8 piles)No. of well slots12No. of Wells8Gas processing capacity per dayProduction toTeesside Gas Processing PlantPipeline length and diameter100 km, 20-inchPipeline NumberPL2768.1 PL2768.2Methanol importFrom shore by pipelinePipeline length and diameter100 km, 3-inchPipeline NumberPL2769.1 PL2769.2 The export pipeline from Breagh runs 100 km to shore at Coatham Sands. From here a 10 km onshore pipeline carries gas to the Teesside Gas Processing Plant (TGPP).

The entry specification for 3rd party gas into the export pipeline is: +Breagh to Teesside pipeline entry specificationParameterValueGross Calorific Value37.5 - 42.3 MJ/m3Oxygen9 ppm maxCarbon Dioxide2.8% mol maxHydrogen Sulphide3 ppm maxTotal Sulphur14.4 ppm maxWobbe Index47.5 - 51.2 MJ/m3

In addition to the Breagh offshore facilities a new gas process facility was constructed at Seal Sands, the Teesside Gas Processing Plant which received and treated the gas prior to shipment into the National Transmission System.

Production

Data for 2021 is for January to October inclusive.