Line 8 of the Tianjin Metro () is a rapid transit line running from northwest to southeast Tianjin. The Phase I south section of line 8, which was originally called Line 6 Phase 2 during construction, was opened on 28 December 2021. The line is currently 13.42 km long and has 9 stations.
This is the first metro line in Tianjin that uses Type A six car, GoA4 automated trains.
Opening timeline
SegmentCommencementLengthStation(s)Name Lushuidao — Xianshuiguxi 28 December 2021 9 Line 6 Phase 2 (before 2020) (1st section)9 January 2022Temporary ceased operation due to COVID-19 pandemicLushuidao — Hehuinanlu(except Shuanggang)27 January 2022service resumedShuanggang30 January 2022Xianshuiguxi31 January 2022
Stations (northwest to southeast) Station name ConnectionsBus Connections Distance Location NankaiHepingHexi JinnanHexiJinnan
References