British logistics supported the operations of Field Marshal Sir Bernard Montgomery's Anglo-Canadian 21st Army Group in the Western Allied invasion of Germany from 8 January 1945 until the end of the Second World War in Europe on 8 May 1945. To conserve scarce manpower, the British and Canadian forces employed mechanisation and materiel for maximum effect in combat operations. This involved prodigious use of ammunition, fuel, and equipment, which in turn demanded a first-class military logistics system. By this time, the British Army was highly experienced, professional, and proficient.

Originally scheduled to start at the beginning of January 1945, when the ground would have been frozen, Operation Veritable, the 21st Army Group's advance to the Rhine, was delayed for five weeks by the German Ardennes Offensive. It was therefore conducted over muddy and sometimes flooded ground, and roads were sometimes impassable even to four-wheel-drive vehicles. The offensive was supported by 600 field and 300 medium guns. Over 2.5 million rounds of 25-pounder ammunition were made available. The army roadheads were mainly supplied by rail. Fuels were brought by tankers and the Operation Pluto pipeline from the UK, and delivered by barge and pipeline to the army roadheads. Special arrangements were made to supply the Royal Air Force's Fog Investigation and Dispersal Operation, which consumed a night, and the Gloster Meteor jet fighters, which consumed of kerosene each day. Montgomery's armies were reinforced by the redeployment of three divisions from Italy under Operation Goldflake.

The next major operation was Operation Plunder—the assault crossing of the Rhine on 23 March. For this the British Second Army and the US Ninth Army deployed 2,144 field and medium guns, augmented by 3,337 anti-aircraft guns and anti-tank guns. A large force of engineer units was assembled for the operation: 37,000 British and Canadian engineers and pioneers, and 22,000 American engineers. Every available amphibious craft was collected, and they were joined by a Royal Navy contingent of 36 LCMs and 36 LCVPs that were transported by road across Holland and Belgium to participate. Operation Plunder included an airborne operation, Operation Varsity, in which two airborne divisions were landed with a day's supply of food, fuel, and petrol. Engineers soon had bridges in operation over the Rhine that were later superseded by more permanent road and rail bridges.

During the first three weeks of April 1945, the 21st Army Group advanced about across northern Germany to reach the Elbe on 19 April and then the Baltic Sea. Until the railway bridges could be brought into operation, maintenance and support depended entirely on road transport. The 21st Army Group allocated further road transport capacity to the armies by shifting vehicles from the rear areas and immobilising units that were not immediately needed. The corps sometimes had to send their transport back to the army roadheads to assist when major operations were required. The heavy use of road transport meant that the Second Army burned of petrol a day, but pipelines were laid across the Rhine at Emmerich and were in operation by the end of April. On 4 May, Montgomery took the surrender of the German forces in front of the 21st Army Group.

Background

The 21st Army Group was commanded by Field Marshal Sir Bernard Montgomery. It consisted of two armies: the First Canadian Army under General Harry Crerar and the British Second Army under Lieutenant-General Sir Miles Dempsey. Most of its units were British or Canadian, but there were contingents from other countries. In mid-March 1945, the 21st Army Group had 1,703 Dutch, 5,982 Czech, 6,696 Belgian, 14,915 Polish, 182,136 Canadian, 328,919 American and 744,361 British servicemen, for a total strength of 1,284,712 personnel. The RAF Second Tactical Air Force, operating in support, also had Australian, French, New Zealand and Norwegian squadrons. Although it contained personnel from many nations, the logistical support was British. Charles Stacey, the Canadian official historian, noted that:

The 21st Army Group's campaign in North-West Europe had commenced with Operation Overlord, the Allied landings in Normandy on D-Day, 6 June 1944. German resistance was stubborn and the British and Canadian advance much slower than planned until July, when the American Operation Cobra broke through the German defences west of Saint-Lô. What followed was a far more rapid advance than anticipated. The British Second Army liberated Brussels on 3 September and Antwerp was captured virtually intact on 4 September but it could not be used as a port until the Germans were cleared from the Scheldt approaches, through which ships had to pass to reach the port. This required a major operation and the Battle of the Scheldt was not concluded and the port opened for shipping until 26 November. Once it was opened, Antwerp had sufficient port capacity to supply the British and American forces but its use was hampered by German V-weapon attacks.

A new base was developed around Brussels and an advanced base area around Antwerp but supplies were still being drawn from the Rear Maintenance Area (RMA) in Normandy. To get the railway system in operation again required the reconstruction of bridges and the importation of more locomotives. Petrol was brought in by tankers and through the Operation Pluto pipeline from the UK. French, Belgian and Dutch civilian labour was used at the base in a variety of tasks to enable military personnel to be released for service in forward areas. By January 1945, some 90,000 civilians were employed by the 21st Army Group, of whom half were employed in workshops in the advanced base and 14,000 at the port of Antwerp. Belgian Army transport units were trained in the UK and took over the equipment of the 17 general transport companies that had been loaned to the 21st Army Group by the War Office in 1944, allowing their personnel to return to the UK.

During the German Ardennes Offensive in December 1944, the Supreme Allied Commander, General of the Army Dwight D. Eisenhower, had transferred the US First and Ninth Armies to Montgomery's command. Now that the German offensive had been defeated, the US First Army reverted to American command on 18 January 1945 but the US Ninth Army remained part of the 21st Army Group until 4 April. The US XVIII Airborne Corps was assigned to the 21st Army Group for the crossing of the Rhine and again on 25 April for operations between the Elbe and the Baltic Sea. Although they were under the operational control of the 21st Army Group, the administrative control of these US formations remained with the US 12th Army Group.

On 31 December 1944, Eisenhower ordered Montgomery to resume his preparations for Operation Veritable, the objective of which was to defeat the German forces west of the Rhine. He intended to make the main Allied effort in the north, in the 21st Army Group's sector. There were tactical, operational and political reasons for this. The best sites for a crossing of the Rhine were there, a crossing in the north gave access to the North German Plain, where the terrain was good for mobile warfare, for which his Allied forces were particularly suited, it offered a means of cutting off the Ruhr, the main industrial region of Germany and it had the political advantage of involving the British and Canadians. After some debate, the Combined Chiefs of Staff endorsed his strategy at the Malta Conference in January and February 1945.

Operation Goldflake

At the Malta Conference, the Combined Chiefs also decided to reinforce Eisenhower's armies in North-West Europe at the expense of those in the Mediterranean. In view of pressure from the Canadian government to have its forces reunited, the Combined Chiefs decided to send the two divisions of the I Canadian Corps to rejoin the First Canadian Army, followed by up to three British divisions. This was codenamed Operation Goldflake, and it involved the redeployment of the I Canadian Corps and British 5th Division from Italy to North-West Europe. At this time the ration strength of the 21st Army Group (which also counts civilians and prisoners of war being fed by the army as well as the troops) was around 1.2 million; that of the Mediterranean theatre was 1.4 million. The transfer involved 102,415 troops. A request from the 21st Army Group for more resources to support the redeployed formations was rejected by the War Office; any further support units required had to either be drawn from the Mediterranean or supplied by the 21st Army Group. To secure the required transportation resources, eleven general transport companies, seven artillery transport platoons, a tank transporter company, a bulk petrol transport company, a bridge company and an ambulance car company were transferred from Italy.

To cater for the new arrivals, the 21st Army Group asked for four base supply depots (BSDs), six field bakeries, three field butcheries, a cold storage depot and two detail issue depots (DIDs). The Mediterranean theatre was only able to provide two field bakeries. The War Office found that it could provide another two field bakeries from the United Kingdom, along with three field butcheries that were already scheduled to be sent. The other units could not be found, and the 21st Army Group was informed that it would have to make do without them. In May 1945, the 21st Army Group had 25 BSDs, 81 DIDS, 35 field bakeries, and 14 field butcheries.

The headquarters of the 9th Line of Communications Area was transferred to Paris to assist the American Communications Zone with the move. Advance parties from each formation involved travelled by air from Florence, but most Operation Goldflake units moved by sea. It was arranged that 3,700 personnel, 40 tanks, 650 wheeled vehicles and 50 Bren gun carriers would disembark each day in Marseilles, where accommodation was provided for 10,000 troops in tents and parking space for 200 vehicles. The first troops sailed from Naples on the troop ship SS Esperance Bay on 22 February, and arrived at Marseilles two days later. Lorries then took them to the dispersal point at Renaix via Lyon and Dijon, guided by road markers that read "GF". This took another five days. The first vehicles to arrive came with only fifty drivers, so a detachment from 141 Vehicle Park was sent to Marseilles from the RMA. In due course it was relieved by a vehicle park from Italy.

A rail halt was established at Gevrey-Chambertin and bivouac areas at Montbard and Chalon-sur-Saône. The bivouac areas were provided with temporary billets, latrines, emergency rations, and fuel, and medical teams and vehicle maintenance crews were on hand. At the rail stop there were messes and a kitchen that ran 24 hours a day. During the two-hour rail halt, the troops were served a hot meal and provided with sandwiches for their next meal. Four trains a day passed through Gevrey-Chambertin, which handled 72,550 personnel and 4,035 lorries. Road transport accounted for another 29,865 personnel and 23,360 lorries.