The Line 1 of Taiyuan Metro is the second metro line in Taiyuan. The line opened on February 22, 2025.
Opening timeline SegmentCommencementLengthStation(s)Name Helongwan — Wusu 1Hao/2Hao Hangzhanlou February 22, 2025 24 Phase 1
Stations Phase 1 of Line 1 runs from in the northwest to in the southeast and has 24 stations. Phase 2 includes Wusu 3Hao Hangzhanlou station, the station will be constructed together with the terminal 3 of Wusu Airport. Station NameConnectionsDistancekmDistrictWanbailin Taiyuan WestYingze TYVXiaodian TNV TYN
Construction Line 1 began construction in December 2019.
In phase 1, it has a total length of 28.737 km, 24 stations and 2 depots.
The length of phase 2 is 1.85km. It only has 1 station to connect new terminal 3 of Wusu Airport, which will be opened in 2027. The Phase 2 of line 1 extension is not approved and in the future, only shuttle buses will be provided to transport passenger between Terminal 1, 2 and Terminal 3 of Wusu Airport.