Valook Weir is a small diversion dam constructed across Kavadippuzha in Naripatta panchayath of Kozhikode district in Kerala, India. It is one of the two weirs of Vilangad SHEP. It is located 85 km away from Kozhikode town. It is a run- off the river scheme utilizing water of Vaniyampuzha and Kavadipuzha. The weir has a height of from deepest foundation and a length of .
Power project It is a 7.5 MW (3 x 2.50 MW) power project built on Vaniyampuzha and Kavadipuzha, the tributaries of Mahe river, with an investment of Rs 59.49 crore INR. The project consists of dams at Panoth and Valookku and two canals (1750 meter long Valook Canal and 2850 meter long Panoth canal)വിലങ്ങാട് ചെറുകിട ജലവൈദ്യുത പദ്ധതി – ഉദ്ഘാടനം kseb.in and a fore-bay tank with a penstock pipe. This Along with three 2.5 MW generators creates the Power and the water flows through a 124-meter tailrace channel. The power generated is conveyed to Nadapuram substation which is 14 kilometers away from the power house.
Specifications
LocationLatitude:11⁰45’36.5”N Longitude:75⁰46’32.5”E Panchayath : Naripatta Village: Thinur District:Kozhikode River Basin : Mahe puzha River: Kavadi puzha Release from Dam to river : Mahe puzha Taluk through which release flows Vadakara Year of completion : 2014 Name of Project : Vilangad Small Hydro Electric Project Purpose of Project : Hydro Power Dam Features Type of Dam : Concrete gravity Classification : weir Maximum Water Level (MWL):EL 184.96 m Full Reservoir Level ( FRL) : EL 183.90 m Storage at FRL : Diversion only Height from deepest foundation : 7.90m Length :45.95m Spillway : 2 Nos. 1.50 x 1.30 m Crest Level : EL 183.90 m River Outlet: NIL Officers in charge & phone No. : Executive Engineer, KG Division, Kakkayam, PIN-673615 Phone.9446008466 Installed capacity of the Project : 7.5 MW
References
External links Vilangad Small Hydro Electric Project