Kapadigad Hydropower Station (Nepali: कपाडीगड खोला जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Doti District of Nepal. The flow from Kapadigad River is used to generate 3.33 MW electricity. The design flow is 3.81 m3/s and gross head is 170 m.

The plant is owned and developed by Salmanidevi Hydropower Pvt Ltd, an IPP of Nepal. The plant started generating electricity from 2076-02-25BS. The generation licence will expire in 2105-09-13 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.

Leadership The Chairperson of the project is Mrs. Uma Dahal. Followingly, it has 3 Managing Directors and an independent Director.

See also

List of power stations in Nepal