Tatopani Hydropower Station () is a run-of-river hydroelectric plant located in Annapurna Rural Municipality, Myagdi-4, Tatopani, Myagdi District of Nepal. The flow from Tatopani River is used to generate 2.0 MW of electricity. The plant is owned and developed by the government-owned Nepal Electricity Authority. The plant started generating electricity since 2051-12-06 BS. The generation license will expire in 2101-11-30 BS.
The power station is connected to the national grid by a 33 kV transmission line.
It is the first hydropower project in Myagdi district.
Events In 2016, the power plant was damaged extensively by flooding. In April 2020, the inlet valve burst, causing flooding of the powerhouse.
See also
List of power stations in Nepal
References