K13 Harpe Bru Bridge is the first extradosed cable-stayed bridge in Norway.
Technical information:
Extradosed Stay Cable Bridge (Length 320m) spans 45+65+100+65+45m foundations – piles/flat (founded on rock) pylons height 16,0m
Owner:
Statens Vegvesen
Design:
Johs Holt AS
Checking engineering:
COWI AS
Contractor:
Implenia Construction SA
Completion: October 2015
References