Line 8 of the Suzhou Metro () is a L-shaped rapid transit line on both the east-west and north-south axes. It serves Suzhou New District, Gusu District, Xiangcheng District, and Suzhou Industrial Park. Construction started on September 30, 2019, and completed in March 2024. Line 8 was opened on September 10, 2024.
Stations Station name Connections Distance Location -0HuqiuGusuXiangchengYangchenghuzhongluSIPGulou
Future Development A one-station extension from Chefang to Xinpingjie is under planning. The underground extension will be 1.34 km long.
Rolling stock Fleet numbers Year built Time in service Builder Class Number in service No of car Assembly Rolling stock Number Depots Line assigned Notes 246 (41 sets) 2023-2024 2024-present CRRC Nanjing Puzhen B 192 (32 sets) 6 Tc+Mp+M - M + Mp+Tc PM211 080101-084106(0801-0341) Huoditan DepotSanjiaoju Yard
Map
References