Line 1: Terminal Intermodal Gentileza ↔ Santos Dumont is one of the lines operated by VLT Carioca in Rio de Janeiro, Brazil. It became operational on 5 June 2016.
It has a total of 16 stops in operation, all at-grade. Besides that, another one is in planning. The stops Praia Formosa, Rodoviária, Providência, Parada dos Navios/Valongo, Carioca, Cinelândia and Santos Dumont has connection with other transport modals.
The system, operated by Concessionária do VLT Carioca S.A., registered a movement of more than 6 million passengers in the first 10 months of operation. Attends the following districts: Centro, Gamboa, Santo Cristo and Saúde.
History Main events 5 June 2016: Start of assisted operation, between Santos Dumont and Parada dos Museus, Mon-Fri 12p.m.-3p.m., with intervals of 20 minutes between trains and no fee. June 2016: Ampliation of the working hours: 10a.m.-5p.m. Ampliation of the working hours: 8a.m.-5p.m. 9 July 2016: Start of the operation during weekends. 12 July 2016: Start of the operation of branch between Parada dos Museus and Rodoviária. 26 July 2016: Start of the commercial operation. 3 August 2016: Olympic flame is transported through LRT, from Santos Dumont to Cinelândia. 4 June 2017: Start of the operation of the second track of Line 1 between Gamboa and Parada dos Navios.
Interruptions In the first business day of the LRT, on 6 June 2016, an electrical failure interrupted the operation of the service after one of the trains left Antônio Carlos, at 3p.m. (BRT). The activity of the composition was normalized after 20 minutes.
On 8 June 2016, a failure in the energy supply system interrupted the service between stops Sete de Setembro and São Bento. On 23 July, a security device was triggered by some object on the tracks and interrupted the operation in Avenida Rio Branco, next to Avenida Presidente Antônio Carlos and the service was dead for almost 3 hours.
On 31 August 2016, after the automatic shutdown of two Furnas transmission lines, the LRT operation was interrupted for an hour, between 3p.m. and 4p.m. (BRT).
On 25 January 2917, the traffic was interrupted for almost an hour after an accident with an elder woman, who fell next to the Avenida Central building, crossing Avenida Rio Branco. She didn't notice that there were two steps in the central flower bed, stumbled and fell with her face to the ground.
Stations Terminal Intermodal Gentileza → Santos Dumont # Name Opening District Connections 1 Terminal Intermodal Gentileza 23 February 2024 São Cristóvão LRT Line 4 2 Rodoviária 12 July 2016 Santo Cristo Rio de Janeiro Road Terminal LRT Lines 2 and 4 3 Equador 12 July 2016 Santo Cristo Lines 2 and 4 4 Pereira Reis 12 July 2016 Santo Cristo Lines 2 and 4 5 Gamboa 2016 Santo Cristo Lines 2 and 4 6 Providência 4 June 2017 Gamboa Providência Gondola Lift 7 Harmonia 4 June 2017 Gamboa 8 Parada dos Navios/Valongo 13 June 2016 Gamboa Píer Mauá International Ferry Terminal 9 Parada dos Museus 5 June 2016 Saúde 10 São Bento 5 June 2016 Centro 11 Candelária 5 June 2016 Centro LRT Line 3 12 Sete de Setembro 5 June 2016 Centro LRT Line 3 13 Carioca 5 June 2016 Centro LRT Line 3 MetrôRio Lines 1 and 2 14 Cinelândia 5 June 2016 Centro LRT Line 3 MetrôRio Lines 1 and 2 15 Antônio Carlos/MAM 5 June 2016 Centro LRT Line 3 16 Santos Dumont 5 June 2016 Centro LRT Line 3 Santos Dumont Airport
Santos Dumont → Terminal Intermodal Gentileza # Name Opening District Connections 1 Santos Dumont 5 June 2016 Centro LRT Line 3 Santos Dumont Airport 2 Antônio Carlos/MAM 5 June 2016 Centro LRT Line 3 3 Cinelândia 5 June 2016 Centro LRT Line 3 MetrôRio Lines 1 and 2 4 Carioca 5 June 2016 Centro LRT Line 3 MetrôRio Lines 1 and 2 5 Sete de Setembro 5 June 2016 Centro LRT Line 3 6 Candelária 5 June 2016 Centro LRT Line 3 7 São Bento 5 June 2016 Centro 8 Parada dos Museus 5 June 2016 Saúde 9 Parada dos Navios/Valongo 13 June 2016 Gamboa Píer Mauá International Ferry Terminal 10 Utopia/AquaRio 12 July 2016 Gamboa 11 Cidade do Samba/Tia Ciata 12 July 2016 Santo Cristo 12 Santo Cristo 12 July 2016 Santo Cristo LRT Lines 2 and 4 13 Cordeiro da Graça 21 October 2017 Santo Cristo LRT Lines 2 and 4 14 Rodoviária 12 July 2016 Santo Cristo Rio de Janeiro Road Terminal LRT Lines 2 and 4 15 Terminal Intermodal Gentileza 23 February 2024 São Cristóvão LRT Line 4