Line 6 is pink coloured on system maps. An initial section between Shohada Square to Dowlat Abad opened on 7 April 2019. This line is long with 26 stations right now. When completed, it will be long with 32 stations, connecting southeast Tehran to northwest.

See also Holy Mary Metro Station

Route

References