Line 2 of Kunming Metro () is a rapid transit line connecting Panlong District with Kunming's urban center, which is currently long with 14 stations. The line started operation in 2014, and its color is blue. Currently, through service is provided between Line 1 and this line, meaning passengers from/to Line 1 do not need to transfer at South Ring Road station. Nevertheless, once Line 1 Northwestern extension and Line 2 Phase 2 are completed, this line will be separated from Line 1, and South Ring Road station will become an interchange station.

Opening timeline SegmentDate openedLengthStation(s)Name North Coach Station — South Ring Road 30 April 2014 13 Phase 1 North Railway Station 1 September 2014 Infill station 1

Stations Serviceroutes Station name Connections Distance Location ●● -0.00Panlong●●1.131.13●●1.182.31●●1.003.31●●0.934.24●●1.545.78●●Jinxing0.736.51●●1.187.69●● KBM1.088.77●●0.809.57●●0.8010.37●●0.4910.86●●0.5811.44Panlong/Guandu●●0.9512.39Guandu↓↓Through service to/from or Kunming South Railway Station via Line 1 KMMGuandu

References