Line 1 of Shaoxing Metro () is a metro line in Shaoxing, Zhejiang Province, China.
Line 1 is operated by Shaoxing Jingyue Metro Co., Ltd. under PPP Contract, a joinly between Shaoxing Metro Rail Transit Group Co., Ltd. (which holds 49%) and other entities . Section Main line (Keqiao section) The section from Guniangqiao to China Textile City opened on 28 June 2021. The section is in length with 10 stations. Elevated section from Yangxunqiao to Linhang Avenues.
Average speed through the trip: 38.3 km/h
Main line (remaining section) The section from China Textile City to Fangquan is long and runs between China Textile City station in Keqiao District and Fangquan station in Yuecheng District, passing through the city center of Shaoxing with 18 stations. The section opened on 29 April 2022.
Branch line (future Line 4) The branch line will branch off at Huangjiu Town and head north for to Exhibition and Convention Center with 6 stations (5 new stations, Huangjiu Town station is already opened with the main line of Line 1). The initial section opened on 1 April 2024 and the remaining section will open on 30 June 2025. The branch line will be part of Line 4 in the future.
Opening timeline SegmentCommencementLengthStation(s)Name Guniangqiao — China Textile City 28 June 2021 10 Main line (Keqiao section) China Textile City — Fangquan 29 April 2022 18 Main line (remaining section) Huangjiu Town — Daqingsi 1 April 2024 3 Branch line (initial section) Daqingsi — Exhibition And Convention Center 30 June 2025 2 Branch line (remaining section)
Stations Main line Station Name Connections DistanceLocation (Hangzhou Metro)0.13 Xiaoshan, Hangzhou3.53 5.75 Keqiao, Shaoxing9.61 11.30 Yuecheng, Shaoxing (branch) Olympic Sports Center Railway Station City Square
Branch line Station Name Connections DistanceLocation (main line) Yuecheng Keqiao
Rolling stock Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes PM139 B 2020–2021 CRRC Nanjing Puzhen 108 (18 sets) 01 001 - 01 019 (010011–010196) Tc+Mp+M+M+Mp+Tc Wanxiu Road DepotJianhu Yard ZBM02 2020–2022 Beijing Subway Rolling Stock Equipment 162 (27 sets) 01 020 - 01 046 (010201–010466)
References