Shaoxing Metro (), also known as Shaoxing Rail Transit, is the metro system in Shaoxing, Zhejiang province, China. It operates 2 subway lines: Line 1 (including branch line) and Line 2.

Network

LineTerminals Commencement NewestExtension Lengthkm Stations Operator 28 June 2021 30 June 2025(Branch) 47.1 28 Shaoxing Jingyue Metro Co., Ltd. BranchExhibition And Convention CenterDaqingsi1 April 202430 June 20257.36Shaoxing Jingyue Metro Co., Ltd. 26 July 2023 10.73 9 Shaoxing Rail Transit Group Co., Ltd.Total 65.2 42

Annual urban-rail passenger volume reported for Shaoxing by CAMET. Values are passenger-trips in units of 10,000; reporting scope may include non-metro urban-rail modes and can vary by year.China Association of Metros, 2012 annual statistical report and 2025 annual statistical report. The linked Commons data pages identify the intervening annual reports and preserve their source URLs.

Raw passenger-volume data

Year-end urban-rail operating length reported for Shaoxing by CAMET, separating the metro series from the all-mode city total where both are reported.

Raw operating-length data

Line 1

Line 1 began construction in 2016. The section from Guniangqiao to China Textile City opened on 28 June 2021, the remaining section from China Textile City to Fangquan opened on 29 April 2022. A branch line from Huangjiu Town to Daqingsi will opened in 2024. The extension of the branch line to Convention and Exhibition Center will open in 2025. The Line connects the Yuecheng and Keqiao districts to Hangzhou through the western terminus, , as it is also the eastern terminus of Hangzhou Metro Line 5.

Line 2

Line 2 is 10.73 km in length with 9 stations. All stations are located underground. Line 2 opened on 26 July 2023. The Phase two extension will connect the Yuecheng and Shangyu districts of Shaoxing.

Line 4

Line 4, a southern extension of the Line 1 branch, is presently under construction. It includes 20.7 km of new track and 15 new underground stations. It is entirely located in Yuecheng district and will have two interchange stations with Line 1, with one at Huangjiu Town and City square.

Lines under Construction Route NameTermini Planned Opening Length Stations Status NotesPhase 2TanduLiangzhu Avenue202726.1 km7Under constructionLine 4Yinqiao RoadBefore 203020.7 km15Under constructionTotal46.722

Planned The Phase II Construction Plan of the Shaoxing Metro, which encompasses Lines 3, and 5, are currently in the planning stages.

Lines S2 (Shaoxing–Zhuji) and S3 (Shaoxing–Shengzhou–Xinchang) are also under planning.

Rolling Stock

Line 1 utilizes rolling stock produced by CRRC Nanjing Puzhen, with a length of 120 m, height of 3.8 m and width of 2.88 m. It has 2 power cars with 6 cars in total. Each train set has 232 seats with a maximum capacity of 2034 people. It has a top speed of 100 km/h. It features LCD screens that display the station information.

Line 2 ultilizes 4 car trainsets from CRRC Nanjing Puzhen, with a length of 80.84 m and a width of 2.88 m. Line 2 is self driving with windows on both ends of the train. It also features LCD screens that display station information.

Accidents On 13 September 2025 at around 23:40, four cleaners were struck by a train on Line 2, with 3 dead and 1 severely injured. The accident happened outside service hours.

References