The Pujiang Line () is an automated, driverless, rubber-tired Shanghai Metro line in the town of Pujiang in the Shanghainese district of Minhang. It was originally conceived as phase 3 of Shanghai Metro line 8, but afterwards was constructed as a separate line, connecting with line 8 at its southern terminus, Shendu Highway. The line opened for passenger trial operations on March 31, 2018. (Notice: Pujiang Line to begin trial operations in first quarter of 2018.) It is the first automated, driverless people mover line in the Shanghai Metro, and has 6 stations with a total length of . The people mover was expected to carry 73,000 passengers a day.Driverless peoplemover opens in Shanghai The line is colored gray on system maps.

The line is operated by Shanghai Keolis Public Transport Operation & Management Co. Ltd. (), a joint venture owned by Keolis and Shanghai Shentong Metro Group for at least five years after opening.

History colspan="7" style="text-align: center" bgcolor=# | |-bgcolor=#cccccc !Segment!!Commencement!!Opened!!Length!!Station(s)!!Name!!Investment |-bgcolor=#e9e9ea |style="text-align: left;"| Shendu Highway — Huizhen Road | 25 Dec 2015 | 31 Mar 2018 | | 6 | Phase 1 | ¥3.177 billion |- style= "background:#; height: 2pt" | colspan = "7" |

Stations

Service routes M - Mainline: ↔ Huizhen Road ● Fengpu Express0.000.000Pujiang, Minhang31 March 2018Elevated Two Side & one Island●Sanlu Highway2.002.003Elevated Side●Minrui Road1.003.005●Puhang Road0.803.807●Dongchengyi Road1.205.009●Huizhen Road1.606.6011Elevated Island

Important stations - Passengers can interchange to line 8.

Future expansion There are no plans to extend the line.

Station name change On June 9, 2013, the Aerospace Museum was renamed (before Pujiang Line began serving the station).

Headways <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> ! colspan="3" style="text-align: center" bgcolor=# | |-bgcolor=# | colspan=2||| - |-bgcolor=#cccccc ! colspan=3 align=center|Monday - Friday (Working Days) |- |AM peak||7:00–9:00|| 3 min and 20 sec |-bgcolor=#EFEFEF |Off-peak||9:30–18:00|| 6 min and 30 sec |- |PM peak||18:00–20:00|| 3 min and 50 sec |-bgcolor=#EFEFEF |Other hours|| Before 7:00After 20:00 | 8 min |-bgcolor=#cccccc ! colspan=3 align=center|Saturday and Sunday (Weekends) |- |Peak||7:00–20:00|| About 6 min |-bgcolor=#EFEFEF |Other hours|| Before 7:00After 20:00 | About 9 min |- style= "background:#; height: 2pt" | colspan = "3" |

Technology Signalling The entire operation of the new line is remotely controlled from a central dispatch room. Trains operate using the Cityflo 650 communications-based train control (CBTC) from CRRC Puzhen Bombardier Transportation Systems Limited, a joint venture between Bombardier and CRRC Nanjing Puzhen Co., Ltd. The automatic trains had initially six staff members working at each APM station, but the operator hopes to reduce that to one or two.

Rolling Stock

Pujiang Line uses rubber-tyred Bombardier Innovia APM 300 trains. The trains have 4 cars each, totaling in length, with capacity for 566 passengers per train. There are large windows at each end of the train allowing passengers to look out the front and rear. The small trains with rubber tires running on concrete tracks allow for turning radii as tight as to be negotiated, compared to over for typical metro on steel rails. On 13 January 2017, Bombardier delivered the first out of 44 autonomous people movers to Shanghai.

Fleet numbers Manufacturer Time of manufac-turing Class No of car Assembly Rolling stock Number Notes |-bgcolor=#d3d4d5 | 44 || CRRC Nanjing Puzhen Co., Ltd. || 2016-2017 || L || 4 || Tc+T+T+Tc || Innovia APM 300 || T0101-T0111(T010011-T010441)|| Pujiang|| Cars with rubber tires running on concrete tracks. Front of the train adopts an open driver's cab. Doors are wider (1980mm) than on Type A trains (1440mm).

References