The Hohhot–Nanning corridor is a proposed high-speed railway in China running from Hohhot in Inner Mongolia to Nanning in Guangxi. It will pass through the cities of Taiyuan, Zhengzhou, Xiangyang, Changde, Yiyang, Shaoyang, Yongzhou and Guilin. Introduced in 2016, the corridor is one of the sixteen railway lines proposed under China's "Eight Vertical and Eight Horizontal" network.

Overview The Hohhot–Nanning corridor is a vertically-oriented (north–south) corridor with a liner path emanating from Hohhot in Inner Mongolia. It will travel through the provinces of Shanxi, Henan, Hubei and Hunan, before terminating at Nanning in Guangxi. There are no branch lines.

Sections Name Route Design speed(km/h) Length(km) Status Construction start Opened RemarksZhangjiakou–Hohhot HSR – 250 126open27 March 20143 August 2017Ulanqab–Datong HSR – 250reserved for 300km/h296open30 June 202031 December 2024 – Shuozhou East – Datong–Xi'an HSR – 250139open3 December 200928 September 2018Taiyuan–Jiaozuo HSR – 359open16 June 201612 December 2020Zhengzhou–Jiaozuo ICR – 20077.8open29 December 200926 December 2015Jiaozuo–Pingdingshan HSR – – 350240under constructionJune 2025Expected in 2029Zhengzhou–Wanzhou HSR – – 350350open31 October 20151 December 2019Xiangyang–Jingmen HSR – 350117open28 September 202228 September 2025Hankou–Yichang HSRJingmen West – 35063open25 September 202126 December 2025It will initially run on the same tracks as the Jingmen–Yichang section of the Shanghai–Chongqing–Chengdu HSR, but provision will be made for separate tracks.Yichang North – 350185under construction 26 December 2025 expected in 2029Changde–Yiyang–Changsha HSR – 35094open26 December 201726 December 2022Route shared with Xiamen–Chongqing corridorYiyang–Loudi HSR – 350105being planned expected in 2028 Yiyang–Zhanjiang railway()– 20098open28 July 20096 January 2016The line was rebuilt with the duplication and electrification of the original Loudi–Shaoyang section of the Yiyang–Zhanjiang railway – 35096under construction26 December 2023Expected in 2028Hengyang–Liuzhou ICR – Hengyang–Guilin: 200; otherwise: 250497.9openApril 200928 December 2013Liuzhou–Nanning ICR – 250226open27 December 200730 December 2013Nanning–Hengyang HSR – 350being plannedmedium and long term planningMay be designed as an intercity railway

See also High-speed rail in China

Notes

References