The Bandar Utama station is a rapid transit interchange station serving the suburb of Bandar Utama in Petaling Jaya, Selangor, Malaysia as well as parts of Taman Tun Dr Ismail (TTDI), Kuala Lumpur which lie across the Damansara–Puchong Expressway (LDP) from the station.

It is one of the stations of the MRT Kajang Line and LRT Shah Alam Line. The MRT section was opened on 16 December 2016 while the LRT section opened on 29 June 2026.

This station is located next to the 1 Utama Shopping Centre, one of the biggest shopping malls in the Klang Valley. Other well-known landmarks near the station are the One World Hotel, Plaza IBM and KPMG Tower, which are linked to the station via a pedestrian link-bridge.

Station features Kajang Line Overview

The MRT portion of the station is located beside the Damansara-Puchong Expressway (LDP) directly behind the Sri Pentas Building in Bandar Utama. The station's support columns are located between the expressway and the water channel, which runs parallel to the expressway.

The station adopts the standard elevated station design for the Kajang Line, a "wakaf" conceptual design with two side platforms above the concourse level.

However, unlike the other elevated stations, there are no escalators, lifts or staircases linking the station directly to ground level, nor are there any lay-bys for buses, taxis and cars at ground level directly below the station. Access to the station is via link bridges from the 1Powerhouse Building, where the feeder bus stop and park and ride facilities are located, and from the One World Hotel and 1 Utama complex.

Station layout L2Platform LevelSide platform Platform 1: towards (→) Platform 2: towards (←)Side platformL1ConcourseFaregates to paid area, escalators to platforms, ticketing machines, customer service office, station control, shops, Entrance A to pedestrian link bridge to 1Powerhouse building and Shah Alam Line, Entrance B to link bridge to 1 Utama Shopping Centre, emergency staircase to ground level from back-of-house.GGround LevelEmergency services parking bays.

Shah Alam Line Overview The LRT portion of the station is located perpendicular to the Damansara-Puchong Expressway (LDP), and parallel to Sungai Kayu Ara directly beside the 1Powerhouse building in Bandar Utama.

The station adopts the standard station design for the Shah Alam Line; inspired by the "tanjak" conceptual design with an island platform that has a slightly trapezium layout above the concourse level.

Similar to the Kajang Line portion of the station, there are no escalators, lifts or staircases linking the station directly to ground level, nor are there any lay-bys for buses, taxis and cars at ground level directly below the station. Access to the station is via link bridges from the 1Powerhouse Building, where the feeder bus stop and park and ride facilities are located, and from the One World Hotel and 1 Utama complex.

Station layout L2Platform Level Platform 1: UnusedIsland platform, doors will open on the right Platform 2: towards (←)L1ConcourseFaregates to paid area, escalators to platforms, ticketing machines, customer service office, station control, shops, Entrance A to pedestrian link bridge to 1Powerhouse building, Kajang Line, and 1 Utama Shopping Centre, emergency staircase to ground level from back-of-house.GGround LevelEmergency services parking bays.

Exits and entrances Access to both stations are via two pedestrian link bridges: one connecting Entrance A to the neighbouring 1Powerhouse Building which also serves as the interconnecting walkway between the MRT and LRT stations, and another connecting Entrance B to 1 Utama. The second link bridge was opened on 1 February 2018.

All these buildings are owned by Bandar Utama City Corporation Sdn Bhd, making this station the only one on the Kajang Line where access to the station is via properties owned by other entities. There is no access to the station from the ground level directly beneath the station along the Damansara–Puchong Expressway (LDP). The lay-by and stairs at this location are for emergency purposes only.

The 1Powerhouse Building houses the feeder bus stop at the ground level, as well as the park-and-ride facility for the station, which takes up two basement levels. Taxi and private vehicle drop-off areas are also located on the ground floor of the building.

station Entrance Location Destination Picture A Pedestrian link bridge to 1Powerhouse BuildingFeeder bus stop, park and ride, 1Powerhouse, Persiaran Bandar Utama B Pedestrian link bridge to 1 Utama Shopping Centre (1 Utama E)1 Utama Shopping Centre, One World Hotel, IBM Tower, KPMG Tower, 1 First Avenue, Sri Pentas

History

During the planning stage, the station was referred to as One Utama, as it was situated next to the 1 Utama Shopping Centre. However, it was officially renamed Bandar Utama prior to its opening in 2016 after the suburb it is situated in, rather than the name of the shopping complex.

A pedestrian bridge linking the station to the Burhanuddin Helmi section of Taman Tun Dr Ismail (TTDI) residential area, which is geographically located directly across the LDP from the station was also proposed as part of the construction plans. This would have enabled residents of the northern part of the residential area to have access to the station, while the southern part would be served by station which lies 200 metres from the TTDI Wet Market. However, the TTDI Residents Association (RA) objected to the link, citing parking by MRT commuters along Burhanuddin Helmi's roads and illegal stalls as a result of the link. The RA collected signatures of objections from residents, despite MRT Corp's pleas to proceed with the pedestrian bridge for the benefit of the residents.

In the end, in July 2014, MRT acceded to the objection. Once operational however, there were voices of dissent on the lack of connectivity for the residents of TTDI's northern tip.

From its opening on 16 December 2016 till 31 January 2018, the only access to the station was from the 1Powerhouse Building via the pedestrian overhead bridge at Entrance A. A temporary linkway to One World Hotel and subsequently 1 Utama from the station's Entrance B was opened on 1 February 2018, allowing a more direct connection to the shopping centre. On 11 July 2020, with the completion of 1 Utama E (an annexe block and extension of the shopping centre), the temporary linkway was replaced with direct access to 1 Utama E.

Bus services Feeder buses With the opening of the Kajang Line, feeder buses also began operating linking the residential areas of Taman Tun Dr Ismail, Bandar Utama and Kampung Sungai Penchala with this station. The feeder buses operate from the station's feeder bus stop at the adjacent 1Powerhouse building, accessed via Entrance A of the station. These buses do not stop at the Bandar Utama bus hub.

Route No.OriginDestinationViaConnecting toT811RapidKL Bus Route 811 Bandar Utama (Entrance A)Kampung Sungai Kayu Ara Bandar Utama BU 11-12 Mutiara TropicanaPersiaran Bandar Utama Lebuh Bandar Utama Persiaran Tropicana Jalan Tropicana Selatan Jalan Masjid, Kampung Sungai Kayu AraTerminusT812RapidKL Bus Route 812 Bandar Utama (Entrance A)Taman Tun Dr Ismail Kampung Sungai PenchalaPersiaran Bandar Utama Dataran Bandar Utama Lebuh Bandar Utama Jalan Burhanuddin Helmi Jalan Datuk Sulaiman Jalan Sungai Penchala Terminus

Other buses Route No.OriginDestinationViaConnecting to506Bandar Utama bus hub Putrajaya Sentral Bandar Utama (Entrance A) (Bandar Utama-bound only) Damansara Utama / IOI Mall Puchong Puchong Utama Putrajaya–Cyberjaya Expressway 451, P108, T508, T508B, T509, T510, T511, T512, T512B, T513, T513B, T514B, T523, T591B802 Section 11, Kota Damansara Persiaran Bandar Utama Bandar Utama (Entrance A) Lebuh Bandar Utama Persiaran Surian Persiaran MahoganiT808

Park and Ride

The station has an adjoining park and ride facility which is located at levels B1 and B2 of the 1Powerhouse Building. Access to the park and ride facility is via Entrance A and the pedestrian link bridge that connects the station with 1Powerhouse. The facility has around 500 bays.

The park and ride facility is provided by the owners of the 1Powerhouse Building, Bandar Utama City Centre Sdn Bhd, and not the owner or operator of the MRT Kajang Line. As a result, the parking charges are determined by the owner.

MRT users (except for those who board trains at six stations nearest to Bandar Utama MRT station) are charged a flat rate of RM4.30 per entry per day. As the parking facility does not use the Touch 'n Go electronic purse system for payment, MRT users must verify their status with their Touch 'n Go cards used on the MRT at the parking payment machines at the park and ride facility in order to enjoy the flat rate.

MRT users who board trains at the , , , , and stations do not qualify for the flat rate charges (because the flat fee is only applicable to MRT riders who have travelled more than 3 stations away from Bandar Utama).

The park and ride facility is separate from the upper floor parking, which is meant for 1Powerhouse occupants, including guests of the Avante Hotel, which is part of the building. Park and ride flat rate charges are not available at the upper floor parking, where hourly parking charges apply.

Gallery Station

1Powerhouse (Entrance A), Feeder Bus Stop and Park and Ride

1 Utama Pedestrian Link (Entrance B)

See also Kajang line Shah Alam line Bandar Utama Taman Tun Dr Ismail 1 Utama Shopping Centre

References

External links Klang Valley Mass Rapid Transit website Unofficial information resource on the MRT