Line 1 of the Shijiazhuang Metro () is a rapid transit line in Shijiazhuang, Hebei province, China. Currently it is long with 26 stations. The line opened on 26 June 2017.
History Phase 1 Phase 1 of the line began construction on 1 July 2013 and began service on 26 June 2017, completed at a cost of ¥18.892 billion.
Phase 2 initial section The Phase II of Line 1 is with 8 stations. Only 6 stations from Xiaohedadao to Fuze (10.4 km) opened on 26 June 2019.
Phase 2 North section Two more stations, Dongshangze and Dongyang will open later. The section is 3.1 km in length with 2 stations. The section will open in 2024.
Phase 3 (Southwest extension) The Phase 3 will add two more stations (Huai'anlu and Shangzhuang) in Southwest of the line. The extension is under planning.
Opening timeline SegmentCommencementLengthStation(s)Name Xiwang — Xiaohedadao 26 June 2017 20 Phase 1 Xiaohedadao — Fuze 26 June 2019 6 Phase 2 (initial section)
Stations Phase Station name Connections Distance Location Phase 3LuquanPhase 1QiaoxiQiaoxi/XinhuaQiaoxi/Chang'anChang'anYuhuaShijiazhuangdongzhan SXPChang'anPhase 2Zhengding
Rolling stock Services are provided by CRRC Tangshan Type A rolling stock, which are operated in six-car sets that hold up to 2520 passengers each.
References