Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017. Rapid trains started operating on Line 10 in June 2020.

The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car.

Opening timeline SegmentCommencementLengthStation(s)Name Wangjiazhuang – Liyuchi 28 December 2017 18 Phase 1 Chongqing North Station South Square 28 December 2018 infill station 1 Liyuchi – Houbao 18 January 2023 4 Phase 2 (initial section) Houbao – Lanhualu30 November 20234 Phase 2 (remain section)

Stations (north to south)

ServiceroutesStation№ Station name Connections Distance Location ●● -0Liangjiang|●2.042.04●●2.714.75|●1.095.84|●0.826.66|●1.648.30|●2.0510.35●● CKG0.7411.09●● CKG2.2213.31|●5.3118.62|●1.8520.47●●1.6722.14|●2.7424.88|●2.0826.96●● CUW2.6129.57●● CUW0.6030.17|●0.8731.04●●1.6332.67●●1.0933.76●●0.8234.58Yuzhong|●0.9235.5●● 0.8936.39|●2.1238.51Nan'an|| 1.2239.73●●0.9840.71|●1.2741.98●●1.2843.26

Notes

References