The Mistral class is a class of five landing helicopter docks built by France. Also known as helicopter carriers, and referred to as "projection and command ships" ( or BPC) and "porte-hélicoptères amphibie" (PHA) since 2019, a Mistral-class ship is capable of transporting and deploying 16 NH90 or Tiger helicopters, four landing craft, up to 70 vehicles including 13 Leclerc tanks, or a 40-strong Leclerc tank battalion, and 450 soldiers. The ships are equipped with a 69-bed hospital, and are capable of serving as part of a NATO Response Force, or with United Nations or European Union peace-keeping forces.

Three ships of the class are in service in the French Navy: , , and . A deal for two ships for the Russian Navy was announced by then French President Nicolas Sarkozy on 24 December 2010, and signed on 25 January 2011. On 3 September 2014, French President François Hollande announced the postponement of delivery of the first warship, , in response to the Russia–Ukraine crisis. On 5 August 2015, President Hollande and Russian president Vladimir Putin announced that France would refund payments and keep the two ships; the two ships were sold to Egypt within one month.

History

French doctrine of amphibious operations in 1997 In 1997, the DCNS started a study for a multi-purpose intervention ship (bâtiment d'intervention polyvalent or BIP). At the same time, the French doctrine of amphibious operations was evolving and being defined as the CNOA (, "National design for amphibious operations"). The BIP was to renew and increase the amphibious capabilities of the French Navy, which at the time consisted of two and two landing platform docks.

The CNOA was to assert the French Navy's capability to perform amphibious assaults, withdrawals, demonstrations, and raids. This would allow the French Navy to further integrate into the doctrinal frameworks described by NATO's Allied Tactical Publication 8B (ATP8) and the European Amphibious Initiative. While the CNOA made air capabilities a priority, it also recommended an increase in the number of vehicles and personnel that could be transported and deployed; the CNOA fixed the aim to project a force comprising four combat companies (1,400 men, 280 vehicles, and 30 helicopters) for ten days, in a -deep sector; this force should be able to intervene either anywhere within of Metropolitan France, or in support of French oversea territories or allies. As well as joint operations with NATO and EU forces, any proposed ship had to be capable of inter-service operations with the Troupes de Marine brigades of the French Army.Terre information magazine , no. 184 (May 2007)

Evolution of the concept The studies for a multi-purpose intervention ship (, BIP) began during a time where the defence industries were preparing to undergo restructuring and integration. The BIP was intended to be a modular, scalable design that could be made available to the various European Union nations and constructed cooperatively, but political issues relating to employment and repartition of contracts caused the integration of the European nations with naval engineering expertise to fail, and saw the BIP project revert to a solely French concern.

In 1997, several common ship designs referred to as (NTCD), loosely based on the aborted PH 75 nuclear helicopter carrier, were revealed. The largest design, BIP-19, was the future basis of the Mistral class. The BIP-19 included a long flush deck, with a beam, a draught of , and a displacement of 19,000 tonnes; dimensions which exceeded the requirements of the NTCD concept. Three smaller ship designs were also revealed, basically scaled-down BIP-19 versions, with a common beam of : BIP-13 (13,000 tonnes, ), BIP-10 (10,000 tonnes, ), and BIP-8 (8,000 tonnes, ). BIP-8 incorporated features of the Italian amphibious transports, but with a helicopter hangar.

At the design stage, the NTCD concept featured an aircraft lift on the port side (like the U.S. ), another on the starboard side, one in the centre of the flight deck, and one forward of the island superstructure. These were later reduced in number and relocated: a main lift towards the aft of the ship was originally located to starboard but then moved to centre, and an auxiliary lift behind the island superstructure. Concept drawings and descriptions created by Direction des Constructions Navales (DCN), one of the two shipbuilders involved, showed several aircraft carrier-like features, including a ski-jump ramp for STOBAR aircraft (like the AV-8B Harrier II and F-35B fighters), four or five helicopter landing spots (including one strengthened to accommodate V-22 Osprey or CH-53E Super Stallion helicopters), and a well deck capable of accommodating a , or two LCAC hovercraft.TCD classe NTCD A French Senate review concluded that STOBAR aircraft were outside the CNOA's scope, requiring design changes.

The NTCD was renamed Porte-hélicoptères d'intervention (PHI, for "intervention helicopter carrier") in December 2001, before being eventually named Bâtiment de projection et de commandement (BPC) to emphasize the amphibious and command aspects of the concept.

Design and construction At Euronaval 1998, France confirmed plans to build vessels based on the BIP-19 concept. Approval for construction of two ships, Mistral and Tonnerre, was received on 8 December 2000. A construction contract was published on 22 December and, after getting the public purchase authority's approval (Union des groupements d'achats publics, UGAP) on 13 July 2001, was awarded to DCN and Chantiers de l'Atlantique in late July. An engineering design team was established at Saint-Nazaire in September 2001 and, following consultation between DCA and the Délégation Générale pour l'Armement (General Delegation for Ordnance, DGA), began to adapt the BIP-19 design. In parallel, the concept was refined by DGA, DCN, the Chief of the Defence Staff and Chantiers de l'Atlantique. During the design validation process, a th scale model was built and tested in a wind tunnel, revealing that in strong crosswinds, the ship's height and elongated superstructures created turbulence along the flight deck. The design was altered to minimise the effects and provide better conditions for helicopter operations.

The ships were constructed at various locations in two major and several minor components and united on completion. DCN, the head of construction and responsible for 60% of the value of construction and 55% of the work time, assembled the engines in Lorient, combat systems in Toulon, and the rear half of the ship, including the island superstructure, in Brest. STX Europe, a subsidiary of STX Shipbuilding of South Korea, constructed the forward halves of each ship in Saint-Nazaire, and was responsible for transporting them to DCN's Brest shipyard for final assembly. Other companies were involved in the construction: some work was outsourced to Gdańska Stocznia "Remontowa", while Thales supplied radars and communications systems. Each ship was predicted to take 34 months to complete, with design and construction for both costing 685 million Euros (approximately the same cost for a single ship based on or , and approximately the same cost as the preceding Foudre-class amphibious ships, which displaced half the tonnage of the Mistral class and took 46.5 months to complete).Marines : Mistral Shows Up LPD 17 , in Strategy Page (29 May 2007)

Starting from Dixmude, the rest of the French Mistrals and the two Russian Mistrals were built in Saint-Nazaire by STX France, which is jointly owned by STX Europe, Alstom and the French government, with STX Europe having a majority stake. DCNS will provide the combat system. The Russian ships' sterns were built in Saint Petersburg, Russia, by Baltic Shipyard.

DCN laid the keels for the aft part of both ships in 2002; Mistral on 9 July, and Tonnerre on 13 December. Chantiers de l'Atlantique laid the keel of the forward part of Mistral on 28 January 2003, and of Tonnerre later. The first block of the rear of Tonnerre was put in a dry dock on 26 August 2003, and that of Mistral on 23 October 2003. The two aft sections were assembled side by side in the same dry dock. The forward section of Mistral left Saint-Nazaire under tow on 16 July 2004 and arrived in Brest on 19 July 2004. On 30 July, the combination of the two halves through a process similar to jumboisation began in dock no. 9. Tonnerres forward section arrived in Brest on 2 May 2005 and underwent the same procedure.

Mistral was launched on schedule on 6 October 2004, while Tonnerre was launched on 26 July 2005. Delivery was scheduled for late 2005 and early 2006 respectively, but was postponed for over a year due to issues with the SENIT 9 sensor system and deterioration to the linoleum deck covering of the forward sections. They were commissioned into the French Navy on 15 December 2006 and 1 August 2007, respectively.

The 2008 French White Paper on Defence and National Security forecast that two more BPCs would be in French Navy service by 2020. In 2009, a third ship was ordered earlier than expected as part of the French government's response to the recession which began in 2008. Construction began on 18 April 2009 in Saint-Nazaire; the entire ship was built there due to cost constraints. On 17 December 2009, it was announced that this third ship would be named Dixmude.Après le Mistral et le Tonnerre, le «Dixmude» , Ministry of Defence It had been suggested to use the historic name of Jeanne d'Arc following the decommissioning of the helicopter cruiser of that name in 2010, but it was opposed by some French naval circles because France no longer operated a dedicated training ship (the traditional role of warships named Jeanne d'Arc) and now rotated the training role between multiple ships in the fleet. The possibility of a fourth Mistral-class ship was officially abandoned in the 2013 French White Paper on Defence and National Security.

Features and capabilities Based on displacement tonnage, Mistral and Tonnerre are the largest ships in the French Navy after the nuclear-powered aircraft carrier , for roughly the same height above water.

Aviation The flight deck of each ship is approximately . The deck has six helicopter landing spots, one of which is capable of supporting a 33-tonne helicopter. The hangar deck can hold 16 helicopters, and includes a maintenance area with an overhead crane. To aid launch and recovery, a DRBN-38A Decca Bridgemaster E250 landing radar and an optical landing system are used.

The flight and hangar decks are connected by two aircraft lifts, each capable of lifting 13 tonnes. The main lift is located near the stern of the ship, on the centreline, and is large enough for helicopters to be moved with their rotors in flight configuration. The auxiliary lift is located aft of the island superstructure.

Every helicopter operated by the French military is capable of flying from these ships. On 8 February 2005, a Westland Lynx of the Navy and a Cougar landed on Mistral. The first landing of a NH90 took place on 9 March 2006. Half of the air group of the BPCs is to be constituted of NH-90s, the other half being composed of Tigre attack helicopters. On 19 April 2007, Puma, Écureuil and Panther helicopters landed on Tonnerre. On 10 May 2007, a MH-53E Sea Dragon of the US Navy landed on her reinforced helicopter spot off the U.S. Naval Station Norfolk.

According to Mistrals first commanding officer, Capitaine de vaisseau Gilles Humeau, the size of the flight and hangar decks would allow the operation of up to thirty helicopters.Véronique Sartini, "Entretien avec le capitaine de vaisseau Gilles Humeau", in Défense & Sécurité Internationale (ISSN 1772-788X), no 19 (October 2006) Mistral aviation capabilities approach those of the s, for roughly 40% the cost and crew requirements of the American ship.