Line 1 of the Changsha Metro () is a line of the Changsha Metro that runs across Changsha, from Jinpenqiu in the north to Shangshuangtang in the south. It serves 25 stations over 33.43 km, and is coloured red on the system map. It first began operations on June 28, 2016.
History The first phase of the line, spanning from Kaifu District Government to Shangshuangtang, commenced construction work on December 26, 2010. Excavation work was completed in October 2015, and the section was opened on June 28, 2016.
A 5-station, 9.88 km long extension north to Jinpenqiu from Kaifu District Government began construction on October 16, 2020. It was completed on 28 June 2024.
Opening timeline SegmentCommencementLengthStation(s)Name Kaifu District Government — Shangshuangtang 28 June 2016 20 Phase 1Jinpenqiu — Kaifu District Government28 June 20245Northern extension
Stations Station name Connections Distance Location 0.000.00Kaifu1.701.701.803.501.705.201.006.200.807.001.308.30Kaifu/Furong/Tianxin0.608.900.609.50Tianxin1.3510.851.0011.85Tianxin/Yuhua0.7012.550.7513.301.9515.25Tianxin1.0016.251.8018.051.3019.351.8521.20 (Xianfeng)1.0022.201.4023.60
Rolling stock Services on the line are provided by a fleet of 23 Type B train sets manufactured by CRRC Zhuzhou. These train sets run in a six-car formation and have a top speed of , and have double-layered flooring installed for noise reduction and improved passenger comfort.