The Karakurt class, Russian designation Project 22800 Karakurt (), is a class of Russian Navy corvettes (small missile ships) first commissioned in 2018.
The class is intended as a more seaworthy, blue-water complement to the Buyan-M-class corvettes, designed for the littoral zone and which serve in Russia's Caspian Flotilla, Baltic Fleet and Black Sea Fleet. The ships are designed to be armed with Kalibr or Oniks anti-ship cruise missiles and have an endurance of 15 days. They are also to be a cheap alternative for larger frigates, for which construction was delayed due to the suspended military cooperation with Ukraine, and because of Russia's intention to continue the modernization of its navy until all necessary tasks for construction of larger vessels domestically are solved. Delays in the supply of domestically-produced engines for the Karakurt class have held up the completion of several ships.
History
Project 22800 was first publicly presented by Almaz during the International Military-Technical Forum «ARMY-2015», held in Kubinka. At the time, the class was presented yet as "Project 12300". During the exhibition, it was also announced 18 ships are planned for construction.
The first two ships, Uragan ("hurricane", now Mytishchi) and Taifun ("typhoon", now Sovetsk), were laid down at the Pella Shipyard in Saint Petersburg on 24 December 2015.
In August 2016, it was reported that a total of seven ships have been ordered from the Pella Shipyard (one of which would be built at More Shipyard, Feodosia), and that five more ships have been ordered from the Zelenodolsk Shipyard. Three of the five ordered ships, Tsiklon ("cyclone"), Askold and Amur, previously planned to be built by the Zelenodolsk Shipyard, were later laid down at the Zaliv Shipbuilding yard in Kerch, Crimea.
On 29 July 2017, the lead ship of the class was launched.
The Russian Defence Ministry signed a contract for several more vessels during the International ARMY-2017 Military-Technical Forum.
In May 2018, it was reported Mytishchi was undergoing sea trials in Lake Ladoga and the Baltic Sea.
During the International Military-Technical Forum «ARMY-2018», the Russian Defence Ministry signed two contracts for construction of another six vessels. Two ships of the order would be built by the Vostochnaya Verf, Vladivostok and four ships by the Amur Shipyard, Komsomolsk-on-Amur.
On 16 October 2018, Mytishchi began state tests in the White Sea, and was officially accepted into service on 17 December 2018.
Ukrainian forces targeted the Zaliv shipyard with cruise missiles on 4 November 2023. Russian forces stated that a ship was hit. Subsequent imagery appeared to show Askold had been badly damaged. Politico speculated that the ship was hit by a SCALP-EG air-launched cruise missile.
On May 7, 2026, Ukraine carried out strikes on a number of key Russian military assets, including a Russian Karakurt-class corvette at its Caspian Sea base. https://euromaidanpress.com/2026/05/07/russian-karakurt-missile-corvette-just-got-hit-at-its-caspian-sea-base-days-after-another-one-was-struck-in-baltic/#google_vignette
Design
Project 22800 derives from Project 12300 Skorpion, a proposed 1990s Almaz design for a 500-ton displacement missile boat,One Project 12300 boat was laid down in 2001 in Rybinsk, but never completed. and was also heavily influenced by Project 21631, the Buyan-M corvettes. Ships of the class have a stealth shaped superstructure with an integrated mast carrying four phased array radar panels. The primary armament consists of Kalibr cruise missiles or P-800 Oniks supersonic anti-ship missiles carried in eight UKSK VLS cells in the rear part of the superstructure, behind the bridge. The corvettes built for the Russian Navy will be equipped with a 76.2 mm AK-176MA automatic dual-purpose gun, a modernized version of the AK-176. However, at least on the first ship, the 100 mm A-190 was installed. A proposed export version may carry the Italian OTO Melara 76 mm gun. For anti-missile defense, the first two ships carry a pair of AK-630M gun-based CIWS and were upgraded with the Tor-M2KM which is a modular variant of the Tor missile system.
Starting from the third ship, they will be equipped with Pantsir-M, a navalized version of the Pantsir surface-to-air missile system. The third vessel of the class, Odintsovo, entered service in the Baltic Fleet with the Pantsir-M system in November 2020. The project 22800 is not designed for anti-submarine warfare.
Ships
Italics indicate estimates
Name Yard No. Builders Laid down Launched Commissioned Fleet Status (ex-Uragan) 251 Pella Shipyard 24 December 2015 29 July 2017 17 December 2018 Baltic Active (ex-Taifun) 252 Pella Shipyard 24 December 2015 24 November 2017 12 October 2019 Baltic Active (ex-Shtorm) 254 More Shipyard 10 May 2016 9 October 2019 2026? Baltic Reported on "tests" as of 2024 801 Zaliv Shipbuilding yard 26 July 2016 24 July 2020 12 July 2023 Black Sea Likely destroyed in May 2024; Russian sources confirmed the ship's destruction. (ex-Shkval) 253 Pella Shipyard 29 July 2016 5 May 2018 21 November 2020 Baltic Active (ex-Musson) 802 Zaliv Shipbuilding yard 18 November 2016 21 September 2021 ? Black SeaDamaged by missile strike on 4 November 2023; reports suggest that repairs were being attempted as of late 2023 257 Pella Shipyard 24 December 2016 23 October 2018 8 May 2026 Baltic Active 255 More Shipyard 17 March 2017 29 October 2019 2028 Black Sea Launched (ex-Passat) 803 Zaliv Shipbuilding yard 30 July 2017 26 December 2022 26 August 2024 Baltic Active 256 More Shipyard 19 December 2017 13 November 2019 2030 Black Sea Launched 804 Zelenodolsk Shipyard 26 February 2019 30 June 2023 21 December 2024Black Sea Reported deployed from the Black Sea Fleet and operating in the Caspian as of April 2025 201 Amur Shipyard 1 July 2019 27 September 2023 2026 Pacific On sea trials as of 2025 202 Amur Shipyard 1 July 2019 27 September 2023 2026 Pacific Launched 805 Zelenodolsk Shipyard 11 September 2019 7 May 2024 28 August 2025 Black Sea Reported deployed from the Black Sea Fleet and operating in the Caspian as of April 2025 204 Amur Shipyard 26 December 20191 July 2026https://flotprom.ru/2026/%D0%90%D1%81%D0%B73/ PacificBoth under construction; names Ussuriysk & Pavlovsk have also been reported for these vessels 203 Amur Shipyard 29 July 2020 Pacific ? Vostochnaya Verf Pacific Cancelled ? Vostochnaya Verf Pacific Cancelled
Controversy
In November 2022, an arbitration court in Moscow held the first preliminary hearing for a lawsuit against Pella Shipyard of St Petersburg, in which the Russian Defence Ministry is seeking 1.4 billion Rubles (US$23.1 million) over allegations the company was "failing to fulfill supply contracts."Russian shipyard and Defence Ministry tangle over ship price in court, DefenseNews.com, 2022-11-24
References
External links Project 22800 Karakurt-Class Corvettes Project 22800 - Complete Ship List