The Ringzug ("ring train"), also called the 3er-Ringzug ("ring train of the 3") is a passenger transport network in the districts of Tuttlingen, Rottweil and Schwarzwald-Baar in southern Baden-Württemberg, Germany. The Ringzug went into regular operations on 31 August 2003 and has operated in its current form since 12 December 2004. The concept of the Ringzug is the operation of a clockface timetable, coordinated with a variety of other buses and train services, over an S-Bahn-like network in a rural environment. In March 2006, the passenger association Pro Bahn described the Ringzug as an exemplary public transport system at its 2006-passenger transport awards (Fahrgastpreis 2006). The Ringzug has aroused interest beyond the region and can point to steadily rising passenger numbers and declining deficits.

Name

The term Ringzug was chosen because its route was originally intended to form a ring, but it is interrupted by the gap between Immendingen and Donaueschingen. The network also includes lines that are not part of the ring. These include the Trossingen Railway and parts of the Breg Valley Railway, the Wutach Valley Railway and the Tuttlingen–Inzigkofen railway. The alternative term 3er-Ringzug indicates that three districts participate in the project.

History

The majority of stations in the Ringzug area were skipped in the 1970s and 1980s due to the implementation of Deutsche Bundesbahn's so-called eilzugmäßigen (semi-fast running) of regional services. On the 28 kilometre-long section of the Plochingen–Immendingen railway (part of the Gäubahn) between Tuttlingen and Rottweil, Spaichingen was the only remaining stop. No train stopped even in Aldingen, which had 7,500 residents.

Passenger services on the Marbach–Bad Dürrheim railway were abandoned in 1953, the abandonment of passenger services on the Heuberg Railway followed in 1966 and the northern section of the Wutach Valley Railway from Lauchringen to Zollhaus-Blumberg had no scheduled passenger traffic from 1967. After 1972, this was also true for the Breg Valley Railway. Even the Trossingen Railway would have been completely shut down if a decision taken by the Trossingen council in 1996 had been implemented.

In the area of Upper Danube Nature Park between Tuttlingen and Fridingen, the "Danube Valley" model was launched in September 1990 by the district of Tuttlingen to reverse some of the displacement of school transport from rail. Otherwise, public transport in the region was largely focused on school bus services.

As a result of this withdrawal of services from the area, the Schwarzwald-Baar-Heuberg area had no regional connections, except on long-distance services. On the Black Forest Railway, in addition to the express trains, an InterRegio service ran at two-hour intervals between Hamburg and Konstanz. On the Plochingen–Immendingen railway, express trains (Durchgangszug or later EuroCity services) ran from Stuttgart via Zurich to Italy. There were also long-distance passenger trains on the Ulm–Tuttlingen-Donaueschingen–Neustadt (Schwarzw) and the Rottweil–Villingen–Donaueschingen–Neustadt (Schwarzw) routes.

Political decisions on the way to the establishment of Ringzug 1995–2001

In January 1995, the regional association of Schwarzwald-Baar-Heuberg was presented by the Tübingen transport consultant Gerd Hickmann with an elaborate study of an integrated timetable for buses and trains in the Schwarzwald-Baar-Heuberg region. This suggested an integrated regular-interval timetable be introduced in the region to connect rail and bus services. The backbone of this new transport concept would be a Ringzug. Following Hickmann's study his colleague Ulrich Grosse supervised the development of the concept and advised the political authorities to implement it. In January 1996. the district councils of Tuttlingen, Rottweil and the Schwarzwald-Baar-Kreis decided to implement the developed concept under the so-called "Trossingen agreement" (Trossinger Vereinbarung). The residence of then Premier Erwin Teufel as the region's representative in the parliament of Baden-Württemberg assured the promotion of the new transport system.

After the Trossingen agreement, the three councils developed the concept and approved it in 1999. Then, the state of Baden-Württemberg called for tenders for an operator for the Ringzug network. Among several tenders received, four were from railway companies, including Deutsche Bahn. Finally, the tender of Hohenzollerische Landesbahn was accepted at the end of 1999. Between 1999 and 2001, further planning stopped because a dispute over the distribution of operating costs between the districts had broken out. This dispute was settled in 2001 and in the same year, the financial agreement with the State of Baden-Württemberg was also completed. In December 2001, the special-purpose association (Zweckverband) was established to create the Ringzug, initially under the chairmanship of the former administrator of Tuttlingen District, Hans Volle.

Improving transport infrastructure 2001–2003

The partial disuse of lines for decades and the lack of stations required massive investment in transport infrastructure. The signalling technology, which originated in part from the early part of the 20th century, had to be fundamentally overhauled and was eventually replaced by a computerised system. Even electronic interlockings were introduced, which are now remotely controlled from Karlsruhe. Overall the new signalling technology, the stations and the upgrading of the network cost about €67 million. In addition, €33 million was spent on a total of 20 Regio-Shuttle sets that were delivered at the beginning of 2003 and intended for use on the new network. A new depot was built for this in Immendingen.

Limited Ringzug operations in 2003/2004

Originally, the Ringzug was scheduled to open on 15 December 2002, but significant delays in the renovation work delayed the start of operations until 31 August 2003. However, since the infrastructure was not yet fully available at that time, only a limited operation was launched. Many of the proposed new stations were not yet completed, so trains could not stop at them for months. Because an electronic interlocking was being installed at the junction to the Wutach Valley Railway branch in Hintschingen, the line also could not be included at first. So the Ringzug was launched with an incomplete route network and a few stations, which meant that in the first year buses still ran parallel to the railway lines.

Network

Integrated lines

The Ringzug network consists of the following seven railways: The Breg Valley Railway from Bräunlingen (formerly from Furtwangen) to Donaueschingen over its entire remaining length, the Black Forest Railway from Offenburg to Konstanz over the Donaueschingen–Villingen section, the Rottweil–Villingen railway over its entire length, the Plochingen–Immendingen railway over the Rottweil–Tuttlingen section, the Tuttlingen–Inzigkofen railway over the Immendingen–Tuttlingen–Fridingen an der Donau section, the Wutach Valley Railway from Immendingen to Waldshut over the Immendingen–Blumberg-Zollhaus section and the Trossingen Railway from Trossingen station to Trossingen Stadt over its entire length.

None of the railway lines is part of the main line of the Hohenzollern Landesbahn. For the majority of these services the DB Netz is responsible for the railway Infrastructure, while the Trossingen Railway belongs to Stadtwerke Trossingen (the municipal utility), the Wutach Valley Railway belongs to the town of Blumberg and the Hüfingen-Bräunlingen section was the responsibility of the Südwestdeutsche Verkehrs-Aktiengesellschaft ("Southwest German Transport Company", SWEG). The last two were reactivated for the Ringzug, after decades without regular passenger services. On the three lines that do not belong to DB Netz AG, passenger services are now operated exclusively by Ringzug. On the remaining sections there are additional services operated by Deutsche Bahn.

Gap between Donaueschingen and Immendingen

There is a gap in the system between Immendingen and Donaueschingen. This was due to the timetabling in the mid-1990s, when the concept was developed. At that time InterRegio services that ran on the Black Forest Railway between Donaueschingen and Immendingen occupied train paths that the Ringzug would have needed. Therefore, the Ringzug has to date refrained from operating over this route. Instead, it was decided to include the Wutach Valley Railway, running through the relatively sparsely populated Immendingen–Zollhaus-Blumberg section, in the Ringzug. This led to the reactivation of this section, which was not originally planned, leaving the Donaueschingen–Immendingen gap.

After the end of the InterRegio traffic on the Black Forest Railway and changes in the timing of services on this line, it would be now be possible for Ringzug services to operate through the gap between Immendingen and Donaueschingen. This would connect Geisingen station, Geisingen-Gutmadingen, Donaueschingen-Neudingen and Donaueschingen-Pfohren. This is frequently the subject of political discussion, but operations are not currently planned.

Services : – – – – – : Trossingen Bf – : Rottweil – – – – (– )

Stations

By 2004, DB Station&Service established 18 new stations and reactivated 16 abandoned stations for the Ringzug operations. Some existing stations were moved closer to their respective settlements. The average distance between the stations is 1.9 kilometres. All municipalities and parts of municipalities lying on lines are usually connected, so that the large towns will continue to have one or even several stations. Many of the Ringzug stations are request stops, most have access for the disabled.