Line 5 of the Hangzhou Metro () is a subway line in Hangzhou. The line is colored cyan on system maps. All 40 of its stations are underground.
The line is operated by Hangzhou MTR Line 5 Corporation Limited, a joint venture of MTR Corporation (60% shareholding) and Hangzhou Metro Group under PPP contract. Established on 26 June 2017, it's responsible for investment and construction for electrical and mechanical systems as well as the operations and maintenance of the Hangzhou Metro Line 5 (HZL5) for 25 years after full line opens.
Opening timeline SegmentCommencementLengthStation(s)Name Liangmu Road — Shanxian 12 Phase 1 (initial section) Shanxian — Guniangqiao 21 Phase 1 (final section) Jinxing — Liangmu Road 4 Phase 2 South Railway Station Infill station 1 Baoshan Bridge 1East Nanhu 1
Stations
Line 5 runs from East Nanhu to Guniangqiao. The eastern terminus, Guniangqiao, is an interchange with Shaoxing Metro Line 1.
Legend - Operational - Under construction
Station name Connections Distance Location 南湖东0.42 Yuhang金星2.03 2.45绿汀路 2.595.04葛巷1.756.79创景路0.877.66良睦路1.318.97杭师大仓前1.019.98永福0.9310.91五常1.9112.82蒋村2.2715.09 Xihu浙大紫金港0.7915.88三坝2.2818.16萍水街1.4719.63 Gongshu和睦1.0820.71大运河1.6822.39拱宸桥东1.6224.01善贤1.1625.17西文街1.0126.18东新园1.1527.33杭氧1.6328.96打铁关1.0029.86宝善桥1.6331.49建国北路0.8132.30万安桥1.1333.43 Shangcheng城站 HZH1.0834.51江城路0.7535.26候潮门1.4336.69南星桥1.2337.92长河2.7240.64 Binjiang聚才路1.7442.38江晖路1.2343.61滨康路1.9345.54博奥路1.2646.80 Xiaoshan金鸡路0.9247.72人民广场1.2348.95育才北路1.1050.05通惠中路0.7250.77火车南站 HZN1.8652.63双桥1.1453.77姑娘桥 (Shaoxing Metro)2.2656.03
Description Phase 1 of the line is long with 36 stations and runs between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (now Keqiao section of Line 1 of the neighboring Shaoxing Metro). Phase 2 of the line further extends 3.2 km and two stations east to . A , two station extension west to Laoyuhang station in Yuhang District started construction in 2018.
Rolling stock The Line 5 uses higher capacity six car Class AH trains which are 20 cm wider than the Class B trains used in other Hangzhou Metro lines, increasing capacity by about 10%. Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes PM126 AH 2018–2020 CRRC Nanjing Puzhen 366 (61 sets) 05 001 - 05 061 (050011–050616) Tc+Mp+M+M+Mp+Tc Wuchang DepotGuniangqiao Yard PMAAD 2024–2025 54 (9 sets) 05 062 - 05 070 (050621–050706)
Incident On 1 August 2025, some people said that at around 7:00 am on a train departing from East Nanhu station, a screen onboard did not display Line 5 route map and the station information in usual. Instead, it displayed the looped advertisements and Hangzhou MTR logo only on the screen in 12 minutes until it returned to normal at 7:12 am.
See also Hangzhou Metro Shaoxing Metro
References