The Heart of Wales line () is a railway line which connects Craven Arms in Shropshire to Llanelli in South West Wales. It serves a number of rural centres, including the 19th-century spa towns of Llandrindod Wells, Llangammarch Wells and Llanwrtyd Wells. At , from the town of Builth Wells, the line crosses the former route of the earlier Mid Wales Railway, which closed in 1962.

History

Historically, the line was known as the Central Wales line () and also included routes through Gowerton, where the railway crossed the West Wales lines and ran through Dunvant and Killay then down through the Clyne Valley to Blackpill, and then along the sea wall to , near to the former slip bridge, before finally reaching .

This section, built originally by the Llanelly Railway and Dock Company (LR) to compete with the Great Western Railway and break the monopoly they held on Swansea Dock, closed in 1964. Nationalisation of the railways had removed the need for competing routes, and the running down and closure of Swansea North Dock ended the need for freight services on this section. Trains now use the original LR main line to reach the West Wales lines at Llandeilo Junction and thence and , after a reversal.

North of , the route was opened in stages between 1861 and 1868 by a number of different companies, all backed by the London and North Western Railway (LNWR): the , authorised by the (21 & 22 Vict. c. xix) the , authorised by the (22 & 23 Vict. c. cxxi) the , authorised by the (23 & 24 Vict. c. cxli).

The Knighton Railway and the Central Wales Railway were given permission to amalgamate by the (26 & 27 Vict. c. lxxix).

The Knighton Railway Company, Central Wales Railway Company and the Central Wales Extension Railway Company were merged into the LNWR by the (31 & 32 Vict. c. xxxviii). 20th century onwards The 1963 Beeching Report proposed that the entire Central Wales line be closed but this was refused by the Ministry of Transport, except for the Pontarddulais to Swansea Victoria section. As a rural branch line, it survived the Beeching Axe since it carried freight traffic to the steelworks at Bynea and industrial areas such as Ammanford and Pontarddulais, linking them with the docks at Llanelli. It also passed through six marginal constituencies. During engineering work, the line is still occasionally used as a diversionary freight route. The basic service over the line has remained more or less constant since the 1970s, with four or five trains per day in each direction on weekdays, and two or three on Sundays.

The line is single track throughout, except for a few miles at the southern end shared with the Swansea District line, and has been operated under a light railway order since 1972.Central Wales Railway Light Railway (Amendment) Order 1990 www.opsi.gov.uk; Retrieved 2 March 2003 There are five passing loops, at , , , and . Unless "Out of Course" working occurs, the Llanwrtyd passing loop is used on two of the Monday-Saturday services and the Llandrindod passing loop is used on the other two and also on the Sunday services. The signalling was modernised in 1986,NSTR Signalling www.railsigns.co.uk; retrieved 27 Feb 2009 when a system known as No Signalman Token Remote working was introduced. This is overseen by the signaller at , with the token instruments at the aforementioned five passing loops being operated by the train crew. The surviving signal boxes at each station were closed, as part of the modernisation scheme, and the points converted to automatic operation by British Rail.

For more than two years, only two of the loops (Llandrindod and Llanwrtyd) were operational as Network Rail (NR) was unable to source spare parts for the points mechanisms used at all five: the design used is now obsolete. Parts had to be taken from the three decommissioned loops to keep the other two operational.News Article in RAIL Magazine, Issue 614, p.15 In 2009, NR stated its intention to install new conventional electric point machines at all five loops and restore the three out-of-service ones to full working order; this was after being heavily criticised by the chairman of the South Wales branch of Railfuture at the organisation's annual general meeting.Heart of Wales Line In Danger Wales Online; Retrieved 28 March 2009 But they could not give a timescale for this work as design work on the new equipment was still ongoing. NR began the replacement works for the points after first installing the system on the line to Pembroke Dock, at the Tenby loop on 7 December 2009, and then making minor alterations in February 2010. was the first station on the line to be modernised, the rest followed. The £5 million project was completed in October 2010.News Article in RAIL Magazine, Issue 656, p.19

In 2014, Network Rail added exit indicators at the trailing end of each loop to aid in the reversing of services; a decision taken so that all moves have an active indication of the status of the motor points.

Incidents In 1987, tragedy struck the line near Llandeilo when the Glanrhyd Bridge collapsed following heavy flooding and an early morning northbound train plunged into the swollen River Towy, killing four people. For a while, the future of the line was in doubt; the equally rural Carmarthen-Aberystwyth line had been closed in 1965 following serious flood damage as the cost of repairs was deemed unacceptable. Political forces of all sides rallied to ensure the line's survival.

Route

After leaving the West Wales Line at Llandeilo Junction, east of , the route is shared with the Swansea District line as far as Morlais Junction, which was the site of a serious oil train derailment in the summer of 2020. It then passes beneath the M4 motorway and turns northwards towards and Pantyfynnon. The short tunnel before the former station is the oldest surviving example still in use in Wales, dating from 1839, whilst the freight-only branch along the Amman valley to Gwaun-Cae-Gurwen diverges at the latter.

North of , it follows the valley of the River Tywi north to Llandeilo, formerly the junction for , and then Llandovery, crossing the river at Glanrhyd by a replacement single-span bridge that was built and commissioned in 1988. North of Llandovery, the character of the route changes, as it ascends into the Carmarthenshire hills towards the first of the line's two major summits at Sugar Loaf, above sea level, on gradients as steep as 1 in 60."Heart of Wales Railway" Doughty, Audrey, Llandeilo Past & Present

En route, it passes over the long Cynghordy Viaduct across the Afon Bran valley, before crossing the county boundary into Powys through the summit tunnel beneath the Black Mountain range. A descent at 1 in 70-80 follows to Llanwrtyd Wells along the valley of the River Irfon, from where it continues via Builth Road to Llandrindod Wells, which is the largest settlement on the line.

From Llandrindod, the line climbs steadily once more, skirting the Radnor Forest as it heads for the remote station at , some distant from the village it is named after. It then passes another summit near Llangynllo Tunnel, the highest point on the route at above sea level. There then follows a descent to , again at mostly 1 in 60, where the line is carried above the village on a viaduct with ornate castellated turrets at each end.

It then heads to , where the station is in England but the town it serves is mostly in Wales. The last portion of the route then runs through south-west Shropshire, along the valleys of the rivers Teme and Clun to join the main Welsh Marches line at Craven Arms, from where trains continue north to terminate at .

Services

The route is operated by Transport for Wales, which provides the following general off-peak services in trains per day (tpd): 6 tpd to 5 tpd to .

or diesel multiple units are employed on the route. The continued use of Class 153s has received criticism, notably from Kirsty Williams MS, who said:Developing the Heart of Wales Line – Speech by Kirsty Williams AM on 16 November 2005 – archived from original

The line has also been used for exceptional train movements, including: to trains diverted during engineering works between and has special trains from Cardiff for the Royal Welsh Show, which operate via the Swansea District line between and Charter trains taking in the scenery along the route, such as The Welshman charter.

Community rail The line is designated as a community rail partnership.

See also

Railways of Shropshire History of Wales Royal Welsh Show Heart of Wales Line Trail

Notes

References

External links

Heart of Wales Line website Heart of Wales Line Travellers Association website Arriva Trains Wales: Heart of Wales Line historical timetable from 2012 Glanrhyd Rail Disaster, BBC Report Scenic Rail Britain: Heart of Wales Line page Video footage of Llandrindod station Video footage of Knucklas Station