The T6 Beenleigh line is a suburban commuter railway line in Brisbane, Queensland. Operated by Queensland Rail, the line runs for from Beenleigh to Roma Street, where services continue on the Ferny Grove line.

History Originally known as the Logan railway line, the line opened to Loganlea in April 1885 being the first section of the South Coast line which was opened beyond Beenleigh to Southport in 1889.

The original city terminus of the line was Stanley Street, South Brisbane until a dual track line was constructed from Dutton Park to South Brisbane opposite the Victoria Bridge opening in 1891.Armstrong, J. & Kerr, J. 'Destination South Brisbane' ARHS 1978

The railway originally approximately paralleled Fairfield Road between Dutton Park and Yeronga. Following the 1893 Brisbane flood, the Fairfield Deviation realigned the route above the flood level onto the current alignment. The line from Dutton Park to Yeerongpilly was duplicated at the same time.

The standard gauge line from Sydney which opened in 1930 was built parallel to the line from Salisbury to South Brisbane.

The section from Yeerongpilly to Kuraby was duplicated between 1950 and 1952.Kerr, J. 'Triumph of Narrow Gauge' Boolarong Publications 1990

With increasing popularity of the motor car, the South Coast line was closed beyond Beenleigh in 1964.

The opening of the Merivale Bridge in 1978 connected the Beenleigh (and Cleveland) line to the Brisbane CBD, and the line was electrified in 1982. The Merivale Bridge was converted to dual gauge in 1986 and standard gauge passenger trains now terminate at Roma St.

The Gold Coast line was progressively rebuilt on a new alignment south of Beenleigh from 1996. The section from Kuraby to Beenleigh was duplicated in association with the re-establishment of the Gold Coast line in 1995. The standard gauge line was converted to dual gauge and electrified at the same time, creating a third track as far as Salisbury. The third track was later extended from Salisbury to Kuraby in 2008.

On 10 August 2026, the Beenleigh line was numbered T6 (along with the Ferny Grove line) by Translink.

Network and operations Services Most services stop at all stations to Roma Street railway station. The typical travel time between Beenleigh and Brisbane City is approximately 59 minutes (to Central). The line will use Cross River Rail once the project is completed, stopping at three new stations in Brisbane's inner city.

Passengers for/from the Gold Coast line change at either South Bank, Altandi, Loganlea or Beenleigh; Cleveland line change at Boggo Road; Ipswich and Rosewood lines at Roma Street; and all other lines at Central.

Stations + T6 Beenleigh line Station Image Suburb Opened Terrain Connections TimeContinues from T6 Ferny Grove line Roma Street Brisbane CBD Ground 0 South Brisbane South Brisbane Elevated 5 South Bank South Brisbane Elevated 7 Boggo Road Dutton Park Ground 10 Dutton Park Dutton Park Ground 12 Fairfield Fairfield Ground 14 Yeronga Yeronga Ground 16 Yeerongpilly Yeerongpilly Ground 18 Moorooka Moorooka Ground 20 Rocklea Rocklea Ground 22 Salisbury Salisbury Ground 24 Coopers Plains Coopers Plains Ground 27 Banoon Sunnybank Ground 29 Sunnybank Sunnybank Ground 31 Altandi Sunnybank Ground 34 Runcorn Runcorn Ground 36 Fruitgrove Runcorn Ground 37 Kuraby Kuraby Ground 39 Trinder Park Woodridge Ground 44 Woodridge Woodridge Ground 46 Kingston Kingston Ground 50 Loganlea Loganlea Ground 52 Bethania Bethania Ground 56 Edens Landing Edens Landing Ground 58 Holmview Beenleigh Ground 61 Beenleigh Beenleigh Elevated 64

Notes

References

External links

Queensland Rail