The Azura-Edo Power Station is a natural gas-powered open cycle electricity generation plant, with a current operational capacity of 461 megawatts, located in Benin City in Nigeria. This is the first phase of a three-phase construction project of a combined cycle gas plant with planned capacity of 1,500 megawatts.
Location The power station is located to the northeast of Benin City in Edo State, approximately , by road, east of Lagos, Nigeria's commercial capital. This location lies approximately , by road, southwest of Abuja, the country's capital city. The geographical coordinates of the power station are:06°24'32.0"N, 05°41'01.0"E (Latitude:6.408889; Longitude:5.683611).
Overview The Azura-Edo IPP is an open-cycle gas fired power plant. The power station is often referred to as the "Azura-Edo Independent Power Plant" or "Azura-Edo IPP", because the finance required to build the plant was sourced from the private sector, rather than from the government. The private sector owners of the plant took the construction risk. The post-construction risk and the operational risks are also borne by the plant's owners and their operations and maintenance contractors.
Ownership The power station is owned by Azura Power Holdings, an investment holding company for independent power projects in Africa. The majority equity investor in the Azura Power Holdings is Actis Capital, a private equity firm headquartered in London with US$7.8 billion under management. In 2004, it was spun-off from CDC Group, owned by the Government of the United Kingdom.
The minority equity investors in the plant are include: 1. Africa50, a pan-African infrastructure investment platform. 2. Anergi Group, an energy company active in Africa's emerging economies. 3. Amaya Capital, an investment firm with a focus on the infrastructure sector in Africa and 4. The Edo State Government, which holds a 2.5 percent equity stake in the plant.
Financing The power station cost US$900 million to build. The financing was obtained from fifteen financial institutions, in nine countries. The table below, illustrates the debt investors in the project. In addition, the International Bank for Reconstruction and Development (IBRD) provided partial risk guarantees; while the Multilateral Investment Guarantee Agency (MIGA) provided political risk insurance. Both IBRD and MIGA are members of the World Bank Group.
+ Fund Sources for Azura Thermal Power StationNo.Name of LenderDomicile1Overseas Private Investment Corporation United States2CDC Group United Kingdom 3Proparco France 4German Investment Corporation Germany5KfW Germany6Netherlands Development Finance Company Netherlands7Swedfund International Sweden8International Finance Corporation United States 9ICF Debt Pool Canada10Emerging African Infrastructure Fund Mauritius11Standard Chartered Bank United Kingdom12 Rand Merchant Bank South Africa13Standard Bank of South Africa South Africa14Mauritius Commercial Bank Mauritius15First City Monument Bank Nigeria16Siemens Bank Germany
Construction Construction of the plant began in January 2016 under an Engineering, Procurement and Construction ("EPC") contract with a consortium comprising (a) Siemens AG of Germany (b) Siemens Nigeria Limited and (c) Julius Berger Nigeria Limited. Siemens also provided the turbines, generators, transformers and other electrical hardware. The plant was completed on 30 April 2018, six months ahead of schedule, a record achievement for a plant of this size.
Nearly 5 million man-hours of labor were expended on the plant, without a single lost-time injury, and the names of all the developers and construction workers, numbering over 2,000 in total, are now inscribed on a brass plaque at the front of the plant's administration and control building.
See also
List of power stations in Nigeria
References
External links
Official Azura-Edo App