The Kwasa Damansara MRT station is a mass rapid transit (MRT) station that serves the future township of Kwasa Damansara in Selangor, Malaysia, which is currently being developed. It is the first station and northern terminus of both the MRT Kajang Line and MRT Putrajaya Line.

The ceremony to launch Phase One of the Kajang Line by then Prime Minister of Malaysia Najib Razak was held at this station on 15 December 2016, and the station was officially opened on 16 December 2016. The station later became an interchange station between the MRT Kajang Line and the MRT Putrajaya Line which opened to the public on 16 June 2022. Both lines currently terminate at this station.Project information from

Station features Station location

The station is located within the Kwasa Damansara development project, one of two stations to serve this future township. As it is located off Jalan Sungai Buloh, a new access road to the station was built.

Although the tracks at the station are elevated, the station building itself is at-grade, the only one of its kind on the Kajang Line, but similar to several stations on the Kelana Jaya Line.

The station has three levels, with the ground floor being the concourse and the two floors above being platform levels. The two elevated platforms are island platforms, allowing the station to have four platforms to enable it to function as a cross-platform interchange between Kajang Line and the Putrajaya Line.

Platform 1 is dedicated for -bound trains of the Kajang Line. This platform is on Level 2. On the same level is Platform 4, which is used as the terminus of the Putrajaya Line. On Level 1, Platform 2 functions as the terminus for the Kajang Line. Platform 3, across from Platform 2, is for -bound trains of the Putrajaya Line.

History During the early stages of the project before the finalisation of station names, the station station was referred to by the working name Kota Damansara MRT Station. The name Kota Damansara initially caused some confusion; as there was another station named two stations down. This station would eventually be given the name Kwasa Damansara.

Station layout L2Platform 1 towards (←)Island platformPlatform 4 TerminusL1Platform 2 TerminusIsland platformPlatform 3 towards (→)GConcourseFare gates into paid area, escalators and lifts to platforms, Main entrance, Taxi lay-by, Kiss and ride lay-by, Walkway to park and ride, Staff parking

Exits and entrances The station currently has one entrance – Entrance A – although the design caters to future entrances when the area surrounding the station is developed. The entrance currently leads to the station access road and the park and ride facility.

and station Entrance Location Destination Picture A West side of the stationTaxi and private vehicle lay-by, Park N' Ride

Integrated MRT station When Phase One operations for the Putrajaya Line began on 16 June 2022, this station became the northern terminus of the line. At the same time, this station replaced station as the northern terminus of the Kajang Line.

As a result, the and Sungai Buloh stations which were formerly part of the Kajang Line were transferred to the Putrajaya Line.

Gallery

See also Putra Heights LRT station, similar cross-platform concept