Reading railway station is a major transport hub in the town of Reading in Berkshire, England, it is west of . It is sited on the northern edge of the town centre, near to the main retail and commercial areas and the River Thames. It is the busiest station in Berkshire, and the third busiest in South East England.

Reading is the ninth busiest railway station in the UK outside London and the second busiest interchange station outside London.

The station is managed by Network Rail and is served by four train operating companies: Great Western Railway, CrossCountry, South Western Railway and the Elizabeth line.

History Original station

The first Reading station was opened on 30 March 1840 as the temporary western terminus of the original line of the Great Western Railway (GWR). The time taken to travel from London to Reading was reduced to one hour and five minutes, less than a quarter of the time taken by the fastest stagecoach. The line was extended to its intended terminus at Bristol in 1841. As built, Reading station was a typical Brunel-designed single-sided intermediate station, with separate up and down platforms situated to the south of the through tracks and arranged so that all up trains calling at Reading had to cross the route of all down through trains.

In 1844, the Great Western Hotel was opened across the Forbury Road for people visiting the town. It is thought to be the oldest surviving railway hotel in the world. New routes soon joined the London to Bristol line, with the line from Reading to Newbury and Hungerford opening in 1847, and the line to Basingstoke in 1848.

Between 1865 and 1867, a station building, built of buff bricks from Coalbrookdale with Bath Stone dressings, and incorporating a tower and clock, was constructed for the Great Western Railway. Sources differ as to whether this was a new building, or remodelling of an earlier Brunel building. In 1898 the single sided station layout was replaced by four new island platforms and six bay platforms bringing the total number to ten. The old platform (Platform 1) served the down main line and was widened to to contain most of the station's amenities as well as three bay platforms at its western end that served Basingstoke and Newbury traffic. Platform 4 served the up main line as one side of a new island platform. The other side, platform 5, became the down line's relief platform. At across, the island was wide enough to contain refreshment, waiting and cloak rooms as well as a bay platform at each end. The bay at the eastern end (4 East Bay) was for stopping services to London while the west bay (5 West Bay) received Oxford trains. Separated by the down relief loop (fast through line), platform 6 served up relief traffic while its own bay (6 East) at the London end received traffic from the various Great Western branches in the Thames Valley. A string of offices for station staff were built on the other side of the island to shield passengers from the up and down goods lines that ran adjacent to them. For non-stopping trains, an up loop was laid between platforms 1 and 4 but this was used as a carriage siding until 1908. No down loop was laid for the main line so through trains either had to use the down relief loop or slow down to while passing through the station. A pedestrian subway was dug to connect these new platforms and at the other end, access was enabled from the north for the first time in the form of a booking office on Caversham road. Access to the platforms was provided by hydraulic lifts powered by water from a new pumping station opened by the Vastern Road bridge. In January 1899 a new booking office was opened in the main station building and all three of Reading's signal boxes were rebuilt.

Access to the station from Broad Street was not direct, until Queen Victoria Street was built in 1903. This provided a route through to Friar Street and Station Road.

The station was originally named Reading and became Reading General on 26 September 1949 to distinguish it from the neighbouring ex-South Eastern Railway station. The "General" suffix was dropped from British Rail timetables in 1973, but some of the station nameboards still stated "Reading General" in 1974. The juxtaposition of the two stations meant that the town's buses showed the destination 'Stations'.

1965 combined station

From 6 September 1965, services from the former station were diverted into a newly constructed terminal platform (4A) in the General station. This was long enough for a single eight coach train, which was later found to be inadequate, and so a second terminal platform (4B) serving the same line was opened in 1975 for the commencement of the service from Reading to Gatwick Airport.

1989 redevelopment In 1989 a brand new station concourse was opened by InterCity, including a shopping arcade named after Brunel, opened on the western end of the old station site, linked to the platforms of the main station by a new footbridge. At the same time a new multi-level station car park was built on the site of the former goods yard and signal works to the north of the station, and linked to the same footbridge. The station facilities in the 1860s station building were converted into The Three Guineas public house. Elizabeth II reopened the station on 4 April 1989.

2009–2015 redevelopment

By 2007, the station had become an acknowledged bottleneck on the railway network, with passenger trains often needing to wait outside the station for a platform to become available. This was caused by limited number of through-platforms, the flat junctions immediately east and west of the station and the need for north–south trains to reverse direction in the station. The Great Western Main Line at Reading has two pairs of tracks – the Main ('fast') lines on the southern side and the Relief ('slow') lines on the northern side. Trains transferring between the Relief lines and the lines that run through Reading West (to Taunton and to Basingstoke) had to cross the Main lines. Those trains, especially slow-moving freight trains, blocked the paths of express trains.

In July 2007, in its white paper Delivering a Sustainable Railway, the government announced plans to improve traffic flow at Reading, specifically mentioned along with Birmingham New Street station as "key congestion pinch-points" which would share investment worth £600 million. On 10 September 2008 Network Rail unveiled a £400 million regeneration and reconfiguration of the station and surrounding track to reduce delays.Station's £400m revamp unveiled, BBC News Berkshire.Network Rail's plans. The following changes were made: Five new platforms: Four new through platforms on the northern side and an extra bay platform for the Wokingham lines. A new footbridge on the western side of the station, replacing the 1989 footbridge. This also included a new entrance on the southern side, for ticket holders only. A new street-level entrance and ticket office on the northern side of the station. The original subway was converted into a pedestrian underpass between the two sides of the station, with no access to the platforms. Making the Cow Lane bridge under the tracks two-way with a cycle path. A flyover to the west of the station for trains to allow fast trains to cross over the lines to Reading West, replacing the flat junction. A section of track beneath the flyover to provide a connection between Reading West and the relief lines. The redevelopment was designed to provide provision for future Crossrail and Heathrow Airtrack services at Reading station.

The improvements have allowed capacity for at least 4 extra trains in each direction every hour and 6 extra freight trains a day (equivalent to 200 lorries). The local council has also planned developments of the surrounding area in association with the developments at the station.

The cost of the project rose to £897m, but it was completed a year earlier than expected. The rebuilt station was reopened by Queen Elizabeth II on 17 July 2014.

Network Rail took over management of the station from First Great Western in April 2014.

Electrification of the Great Western main line through Reading station was completed in time for electric trains to commence service between Paddington and Didcot Parkway on 2 January 2018.

Motive power depot The GWR built a small engine shed in the junction of the lines to Didcot and those to Basingstoke in 1841. This was enlarged and rebuilt in 1876 and again in 1930. It was closed by British Railways in 1965 and replaced by a purpose-built Traction Maintenance Depot. This was subsequently relocated by Network Rail, during the redevelopment works in the early 2010s, to the northern side of the tracks to the west of the station.

Accidents and incidents Extreme weather was the cause of an early casualty in the station's history. On 24 March 1840, whilst the station was nearing completion, 24-year-old Henry West was working on the station roof when a freak wind (described at the time as a tornado) lifted that section of the roof, carrying it and West around away; West was killed. On the wall of the main station building there is a brass plaque, commemorating the event.

On 12 September 1855, a light engine was dispatched on the wrong line. It was in a head-in collision with a passenger train. Four people were killed and many were injured.

An accident occurred at Reading on 17 June 1914, and was witnessed by the railway historian O. S. Nock, then a schoolboy. The driver of a train to moved off even though the signal was at 'danger', and into the path of an oncoming train bound for ; the only fatality was the driver of the Paddington train.

T. E. Lawrence (Lawrence of Arabia) lost the 250,000-word first draft of his Seven Pillars of Wisdom at the station when he left his briefcase while changing trains in 1919. Working from memory, as he had destroyed his notes after completion of the first draft, he then completed a 400,000-word second draft in three months.

German aircraft tried to bomb the lines into the station during the beginning of World War II.

On 1 August 1990, Class 119 diesel multiple unit L576 collided with a passenger train comprising 4VEP electric multiple units 3508 & 3504, and 4CIG unit 1304 due to overrunning signals. Forty people were injured.

On 23 October 1993, an IRA bomb exploded at a signal post near the station, some hours after 5 lb (2 kg) of Semtex was found in the toilets of the station. The resulting closure of the railway line and evacuation of the station caused travel chaos for several hours, but no-one was injured.

Location

The station is on the northern side of central Reading. Since its most recent redevelopment, it now has two principal entrance facades, one facing south to the town centre and the other north to the River Thames. These are linked to each other and to the platforms for passengers by a transfer bridge (a broad covered overbridge with shops). Outside the ticket barriers they are also linked by the former station subway, which has been converted into a public pedestrian and cycle route.

The southern facade hosts two entrances, one either side of the Three Guineas pub that occupies the original 1860s station building. These provide access to a multi-level streetscape, with a pedestrianised Station Square at the higher level and the taxi rank at a lower level. This streetscape is surrounded by the new Station Hill development, Thames Tower and the Malmaison Hotel.

The northern facade has a single entrance, providing access to a second taxi rank, a bus interchange used by buses heading across the river to and from Caversham, and to the station multi-storey car park. These in turn connect to the town's Inner Distribution Road.

In the chainage notation traditionally used on the railway, the station's location on the Great Western main line is from Paddington.Engineer's Line References RailwayCodes.org

Station layout Since 2013