The Clark Street station (originally the Brooklyn Heights station) is a station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. It is located at Clark Street and Henry Street in Brooklyn Heights, Brooklyn. It is served by the 2 train at all times and the 3 train at all times except late nights. At approximately deep, the Clark Street station contains one island platform and two tracks. Its only exit is via a set of three elevators, which lead from a passageway above the platform to the ground story of the Hotel St. George. Despite being one of three New York City Subway stations that can only be accessed by elevators, the Clark Street station is not wheelchair-accessible, with only stairs leading to the platforms.
The Clark Street station was built for the Interborough Rapid Transit Company (IRT) as part of the Clark Street Tunnel, which in turn was built as part of the Dual Contracts. It opened on April 15, 1919, and initially had two elevators; a third elevator was installed in 1931. Two of the elevators were replaced in 1962, and the station received a major renovation in the 1980s. Due to repeated breakdowns of the elevators, further replacements took place in 2000 and between 2021 and 2022, requiring the full closure of the Clark Street station.
History Construction and opening
The Interborough Rapid Transit Company (IRT) opened its first subway line in 1904; the line was extended from Manhattan to Downtown Brooklyn in 1908 with the opening of the Joralemon Street Tunnel. Residents of Brooklyn Heights, a largely residential neighborhood near Downtown Brooklyn, expressed concerns in 1909 that there was no subway station within Brooklyn Heights, even though the line had an emergency exit at Joralemon and Hicks Streets in the center of the neighborhood. After the first line opened, the city began planning new lines. In April 1912, the New York Public Service Commission gave the Brooklyn Rapid Transit Company (BRT) the right to operate the proposed Clark Street Tunnel under the East River, between Old Slip in Lower Manhattan and Clark Street in Downtown Brooklyn, with a stop along Clark Street. The next month, the Old Slip–Clark Street route was assigned to the IRT instead; the plans called for a station at Clark Street. As part of the Dual Contracts between the government of New York City, the BRT, and the IRT, which were signed in 1913, the Clark Street Tunnel was assigned to the IRT, becoming the Brooklyn branch of the Broadway–Seventh Avenue Line, which diverged from the original subway south of Times Square.
The Clark Street Tunnel consisted of a pair of tubes, with a station at the eastern end of the tubes. This station, the line's first stop in Brooklyn, was to be at Clark and Henry Streets. By November 1913, the Public Service Commission had decided that the Brooklyn Heights station would be a deep-level station that would be solely or primarily accessed by elevators. Booth & Flinn Ltd. and the O'Rourke Engineering Construction Company received a $6.47 million contract in July 1914 to build a tunnel between Old Slip in Manhattan and Clark Street in Brooklyn. Construction of the tunnel began on October 12, 1914, and both tubes were holed through in December 1916. The station was named the Brooklyn Heights station in 1917. By January 1919, the tracks had been completed, but signals and station finishes were still being installed. Because the station was deep, it could only be accessed by elevators from the lobby of the Hotel St. George. The tube was largely finished by March, and the IRT decided to push forward the tunnel's opening after learning that BRT workers might go on strike.
On April 15, 1919, the Clark Street Tunnel opened, and this station opened with it, extending West Side Line express trains from Wall Street on the other side of the East River to Atlantic Avenue via a new connection at Borough Hall. The connection doubled the number of IRT trains that could travel between Manhattan and Brooklyn, and it eased congestion in the Joralemon Street Tunnel, the only other tunnel carrying IRT trains between the two boroughs. Direct express service to Times Square was provided to the inhabitants of Brooklyn for the first time as a result (trains through the Joralemon Street Tunnel made express stops in Manhattan, skipping Times Square). Soon after the station opened, the Public Service Commission began planning to install an escalator there, as passengers had to climb 71 steps to exit the station; the escalator was not built.
Post-opening
1920s to 1960s After Brooklyn Heights residents complained that sailors were using the Clark Street station at night to travel to the Brooklyn Navy Yard, Rear Admiral Charles Peshall Plunkett of the United States Navy stationed guards outside the station in 1924 to prevent sailors from using it from 6 p.m. to 6 a.m. to reduce overcrowding. The station's existing elevators had reached capacity by 1930. This prompted the New York State Transit Commission to mandate on April 30, 1930, that the IRT install a third elevator at the station, using an existing elevator shaft. The commission approved a $41,300 contract for the installation of an elevator in December 1930. This elevator went into service on November 25, 1931. Additionally, the IRT had installed silencing devices on the station's turnstiles by early 1931. The city government took over the IRT's operations on June 12, 1940.
As part of a modernization program for the New York City Subway system, the New York City Board of Transportation provided funding for the lengthening of the Clark Street station's platform during the 1950 fiscal year. The New York City Transit Authority (NYCTA) announced plans in 1956 to add fluorescent lights above the edges of the station's platforms, which were installed the next year.
The station's first automatic elevator was installed in April 1962; it ran automatically during middays and evenings and was staffed by an operator at other times. Afterward, the NYCTA converted a second manual elevator to automatic operation. This prompted concerns from riders who said the automatic elevators might attract muggers. During the 1964–1965 fiscal year, the platforms at Clark Street, along with those at four other stations on the Broadway–Seventh Avenue Line, were lengthened to to accommodate a ten-car train of IRT cars. The work at Clark Street was performed by the Arthur A. Johnson Corporation.
1970s to 1990s
Local residents began raising concerns about the unreliability of the station's elevators in the early 1970s. The subway system's operator, the Metropolitan Transportation Authority (MTA), allocated funding for the replacement of the station's only remaining manual elevator in 1975 as part of the MTA's six-year capital plan. Developer Martin J. Raynes began converting part of the Hotel St. George, above the station, to an apartment building in 1978. As part of the project, mayor Ed Koch announced that the developer had agreed to renovate the hotel's subway entrance. On January 3, 1980, work began on a $225,000 project to renovate the arcade entrance to the station through the St. George Hotel. As part of the project, storefront repairs would be made, and new flooring and doors would be installed.
The station was selected for a renovation in 1979, and design work was completed in early 1982, after the Municipal Arts Society had taken over management of the design work in 1980. The MTA had listed the station among the 69 most deteriorated stations in the subway system in 1981. A renovation of the station, conducted as part of the MTA's Adopt-A-Station Program, was unveiled on February 9, 1983. The $260,000 cost was roughly evenly split between public and private agencies, with $120,000 coming from St. George Tower Developers. Neighborhood maps were added to the station as part of the project. Further renovations of the Clark Street station were funded as part of the MTA's 1980–1984 capital plan. The MTA received a $106 million grant from the Urban Mass Transit Administration in October 1983; most of the grant would fund the renovation of eleven stations, including Clark Street.
A further renovation during the mid-1980s involved refinishing the platform, installing new lights and new signs, repainting the station, and adding artwork. The project was budgeted at $1.25 million and was to begin in January 1984, but it quickly experienced delays and budget overruns, in part due to issues with the contractor. The MTA fired the original construction contractor, Standard Construction Services, in October 1985. At the time, the project was only 25 percent complete; tiles on the floors and walls had been removed, and part of the passageway connecting the platform to the elevators had been closed off, causing severe congestion during rush hours. The MTA hired a new contractor. The passageway was partitioned off for over two years while new tiles were installed on the walls; work was complicated by the fact that some of the tiles had been stolen. The renovation was also delayed because of poor communication: in one case, contractors installed a public-address system on a beam that was intended to contain new lighting. The project was completed in May 1987, and an artwork by Ray Ring was dedicated at the station in April 1988.
The Clark Street station's elevators had deteriorated by the 1990s, and residents described the station as dirty, unmaintained, and technologically obsolete. In 1990, Newsday reported that the emergency bell for the elevators were installed outside the token booth, meaning that token booth clerks could not hear when there was an issue. The same year, snowfall on a third rail caused an electrical fire in a tunnel near the Clark Street station, killing two people and injuring 149 others; it was the subway's worst-ever fire at the time. The severity of the fire was exacerbated by the fact that ventilation fans near the station were not working. The MTA had ordered four replacement fans in 1977 but did not install them until after the fire. The new fans had to be modified, as they required too much electricity and could not turn on. Another electrical fire occurred in an elevator room in 1992, although no one was injured in that incident. Newsday, in 1992, reported that one of the station's elevators had recorded 24 outages in six months and was non-functional for nearly a quarter of that time.
2000s to present
By early 2000, one of the station's elevators was so unreliable that it only operated during the morning peak. The other two elevators were supposed to run 24 hours a day, but one of the elevators was only operational 82 percent of the time, while the other was operational 94 percent of the time. That January, the MTA announced that it would close the Clark Street station for four months to repair the elevators, which dated from 1962. The project was estimated to cost $2 million. Although many merchants and residents opposed a full shutdown, the MTA estimated that it would be quicker than staggered repairs that could take up to two years. The station closed temporarily in April 2000; although the storefronts near the fare-control area remained open, their operators reported steep declines in business. To encourage on-time completion, the MTA charged the contractor $15,000 for every day the project was delayed. The project cost $3.5 million and was completed in August 2000, but riders reported that the elevators still sometimes broke down.
The elevators were repaired again in 2007. Transit Wireless installed Wi-Fi and cellular equipment at the Clark Street station in January 2017, making it the last underground station in the New York City Subway system to receive Wi-Fi and cell service. From June 2017 to June 2018 there was no weekend service at the Clark Street and Hoyt Street stations to repair damage to the Clark Street Tunnel from Hurricane Sandy and fortify it for future storms.