The Changzhou Metro is a rapid transit system in Changzhou, Jiangsu province, China.

The system started operation on 21 September 2019, with the opening of its first line, Line 1, becoming the 35th city in China with a subway in mainland China. The Changzhou Metro currently has Line 1 and Line 2 in operation, while Line 5 and Line 6 are under construction.

Announcements are made in Mandarin and English.

Lines in operation LineTerminals(District) Commencement Lengthkm Stations (Xinbei) (Wujin) 21 September 2019 34.24 29 (Zhonglou) (Wujin) 28 June 2021 19.79 15Total54.0343

Annual urban-rail passenger volume reported for Changzhou by CAMET. Values are passenger-trips in units of 10,000; reporting scope may include non-metro urban-rail modes and can vary by year.China Association of Metros, 2012 annual statistical report and 2025 annual statistical report. The linked Commons data pages identify the intervening annual reports and preserve their source URLs.

Raw passenger-volume data

Year-end urban-rail operating length reported for Changzhou by CAMET, separating the metro series from the all-mode city total where both are reported.

Raw operating-length data

Line 1

Line 1 started operation on 21 September 2019. Construction for Line 1 began on 28 October 2014. The first phase runs from () in the north to () in the south. It is in length with 29 stations, including 27 underground and 2 elevated. The line will be extended North for 3.5 km and South for 3.2 km.

In its first year of operation, the highest passenger flow in a single day was 243,000 on October 2 and total ridership in 2019 was 10.3 million.

Line 2

Construction for Line 2 began on 13 February 2017. It is in length with 15 stations, from to . It was opened on 28 June 2021.

Future expansion Short term plan Line Construction start Estimated opening Section Stations Length References (North ext.) Forest Park - Chunjiang 2 3.5 (South ext.) Nanxiashu - Changzhou South railway station 2 3.2 (West ext.) Hexi - Qingfeng Park 7 8.6 (East ext.) Wuyi Lu - Qishuyan railway station 4 5.0 October 2023 2028 Lanyuewan - Dongqing 25 30.9 October 2024 2029 Wujin Yanjiang railway station - Jianye Lu 21 28.9

Construction of a two-station pilot section for Line 5 at the Lanyuewan terminal commenced in October 2023. The full-scale construction of Line 5 is scheduled to begin in 2024, with an anticipated completion date set for 2028.

Long term plan According to the "Changzhou Urban Rail Transit Construction Plan (2011~2018)", the urban rail transit network of Changzhou City is planned to consist of 6 lines by 2050.

Line Construction start Estimate opening Section Stations Length References Changzhou North railway station - Lijia Photovoltaics Industry Part - Jianhu Parking

Fares The Changzhou Metro system operates with a base fare of 2 yuan, covering the initial 5 kilometers, and subsequent price increments at intervals of 5, 7 and 9 kilometers, with each step adding 1 yuan to the fare. Specifically, fares are structured as follows: 2 yuan for journeys up to 5 kilometers, 3 yuan for trips spanning 5-10 kilometers, 4 yuan for distances of 10-15 kilometers, 5 yuan for 15-22 kilometers, 6 yuan for 22-29 kilometers, and a progressive increase of 1 yuan for every additional 9 kilometers beyond 29 kilometers.

Trains Trains for the first phase were manufactured by CRRC Nanjing Puzhen. Changzhou Rail Transit Line 1 operates Type B cars, with each train consisting of 6 cars - 4 motor cars and 2 trailer cars. The first phase of the project involved the procurement of 36 trainsets. A 6-car set spans approximately 120 meters (393 ft 8 in) in length and is 2.9 meters (9 ft 6 in) wide, capable of reaching a maximum operating speed of 80 km/h (50 mph). Each car features 4 pairs of 1.3 meters (4 ft 3 in) wide doors on both sides, accommodating up to 2062 passengers. The trains are constructed using lightweight aluminum alloy material, designed for a service life of 30 years.

Network map

References