This list contains all spacewalks performed between 2015–2024 where an astronaut has fully or partially left the spacecraft.
As of 19 August 2016, 215 astronauts have made spacewalks (out of 549 people who have gone into Earth orbit).
Since 1981, NASA has measured spacewalk duration from when the suits went to internal power until the start of airlock re-pressurization. Roscosmos and China have always used the time from hatch opening to hatch closure. These charts typically follow the agency's measurements of spacewalk duration, because those figures tend to be the most readily available, as they are most often provided by the agency.
2015–2019 spacewalks
Spacewalk beginning and ending times are given in Coordinated Universal Time (UTC).
2015 spacewalks
# Start date/time Duration End time Spacecraft Crew Remarks 374 21 February12:45 6 hours, 41 minutes 19:26 Rigged and routed power and data cables at the forward end of the Harmony module as part of preparations for the installation of the International Docking Adapter at PMA-2. 375 25 February11:51 6 hours, 43 minutes 18:34 Completed power and data cable routing at the forward end of the Harmony module. Removed launch locks from forward and aft berthing ports of Tranquility to prepare for relocation of the Permanent Multipurpose Module and the installation of the Bigelow Expandable Activity Module. Lubricated end effector of Canadarm2. 376 1 March11:52 5 hours, 38 minutes 17:30 Finished cable routing, antenna and retro-reflector installation on both sides of the ISS truss and on other modules in preparation for the installation of the International Docking Adapter at PMA-2 and 3. 377 10 August14:20 5 hours, 31 minutes 19:51 Installed gap spanners on the hull of the station for facilitating movement of crew members on future spacewalks, cleaned windows of the Zvezda Service Module, installed fasteners on communications antennas, replaced an aging docking antenna, photographed various locations and hardware on Zvezda and nearby modules, and retrieved a space environment experiment. 378 28 October12:03 7 hours, 16 minutes 19:19 Prepared a Main Bus Switching Unit for repair, installed a thermal cover on the Alpha Magnetic Spectrometer, lubricated elements of the Space Station Remote Manipulator System, and routed data and power cables to prepare for the installation of the International Docking Adaptor at PMA-2 and 3. 379 6 November11:22 7 hours, 48 minutes 19:10 Worked to restore a portion of the ISS's cooling system to its primary configuration, returning ammonia coolant levels to normal in the primary and backup radiator arrays. 380 21 December13:45 3 hours, 16 minutes 16:01 Released a brake on the Mobile Servicing System to allow it to be properly stowed prior to the arrival of a visiting Progress vehicle. Routed cables in preparation for the installation of the Nauka module and the International Docking Adapter, and retrieved tools from a toolbox.
2016 spacewalks
# Start date/time Duration End time Spacecraft Crew Remarks 381 15 January13:48 4 hours, 43 minutes 18:31 Replaced a failed voltage regulator responsible for shutting down one of the station's eight power channels in November 2015, and routed cables in support of the installation of the International Docking Adaptor. EVA terminated two hours, early due to water leakage in Kopra's helmet, but the primary task was accomplished. 382 3 February12:55 4 hours, 45 minutes 17:40 Deployed a commemorative flash drive, took samples of module exteriors, installed handrails for use in future EVAs, retrieved an astrobiology experiment, deployed a materials science experiment, and tested a tool for applying coatings to module exteriors. 383 19 August12:04 5 hours, 58 minutes 18:02 The astronauts installed the International Docking Adapter (IDA) which was delivered by Dragon CRS-9, allowing future commercial crew spacecraft to dock with the station. This first IDA was attached to Harmony's forward port, over the existing Pressurized Mating Adapter (PMA). The EVA terminated after completing the primary objective, without completing the secondary objectives, due to a malfunction of the right earphone of Jeff Williams. 384 1 September11:53 6 hours, 48 minutes 18:41 The crew retracted a thermal radiator which is a backup, and then installed the first pair of several high definition cameras to monitor the traffic around the station. Then they performed some maintenance operations.
2017 spacewalks Source:
# Start date/time Duration End time Spacecraft Crew Remarks 385 6 January12:23 6 hours, 31 minutes 18:54 The crew completed the installation of new batteries on the Station's power channel 3A, and then executed a series of tasks to get ahead for the next EVA. Kimbrough collected photos of the AMS-02, then they removed a broken light on the S3 truss and routed Ethernet cables on the Z1 truss. 386 13 January11:22 5 hours, 58 minutes 17:20 The crew completed the installation of new batteries on the Station's power channel 1A, and then executed a series of get ahead tasks. First they installed a new camera on the Mobile Transporter Relay Assembly, then Pesquet replaced a Worksite Interface Adapter on Canadarm-2 and collected photos of Z1 truss and S0 truss, meanwhile Kimbrough removed 2 handrails from the Destiny module. Then they picked up a bundle of covers and brought them to the Tranquillity module where will be installed when Pressurized Mating Adapter 3 will be moved from Node 3 to Node 2. When removed, the PMA's Common Berthing Mechanism will be covered up to protect it from the space environment. 387 24 March11:24 6 hours, 34 minutes 17:58 Kimbrough replaced the External Control Zone 2 (EXT-2) Multiplexer-Demultiplexer (MDM) with an upgraded "EPIC MDM" and prepared PMA-3 for its robotic relocation on Sunday. Pesquet inspected the Radiator Beam Valve Module for ammonia leaks, then lubricated one of the Latching End Effectors of Dextre. Kimbrough then replaced a pair of cameras on the Kibo module, and a light on one of the CETA carts. 388 30 March11:29 7 hours, 4 minutes 18:33 Kimbrough replaced the External Control Zone 1 (EXT-1) Multiplexer-Demultiplexer (MDM) with an upgraded "EPIC MDM" while Whitson connected heater power and heater feedback telemetry to enable PMA-3 to be repressurized, then released a series of straps to free up a cover that protected the APAS. The astronauts then installed 4 axial shields on PMA-3's former location on Tranquillity module and installed covers on PMA-3. 389 12 May13:01 4 hours, 13 minutes 17:21 EXT-1 MDM Remove & Replace Lab EWC Antenna Install 390 23 May11:20 2 hours, 46 minutes 14:06 Throughout this hurriedly planned 'contingency' spacewalk, both Fischer and Whitson successfully replaced a failed multiplexer-demultiplexer (MDM), and installed a pair of antennas on station to enhance wireless communication for future spacewalks. 391 17 August14:36 7 hours, 34 minutes 22:10 Test of an upgraded version of the Orlan space suit, the Orlan MKS Restavratsiya retrieval Deployment of 5 small satellites Impakt installation Adapter installation on Poisk sensors BKDO (БКДО) reposition Test sample collection Hand rail and exposure init installation 392 5 October12:05 6 hours, 55 minutes 19:00 Removal of LEE-A from SSRMS Removal of POA LEE via 6 EDF Bolts Installation of POA LEE as new SSRMS LEE-A Installation of former LEE-A on POA SSRMS Power-Up and Checkout 393 10 October11:56 6 hours, 26 minutes 18:22 ESP-1 PFCS Rotate by 90° CP9 Camera Group R/R LEE-A Ballscrew Lubrication POA LEE Socket Removal MT Camera Lens Replacement Hand Rail Removal (x2) 394 20 October11:47 6 hours, 49 minutes 18:36 Dextre EOTP Fuse Replacement Canadarm2 LEE-A CLA Remove and Replace CP3 HD Camera Installation MLI Removal from ORUs (x2)
2018 spacewalks Source:
# Start date/time Duration End time Spacecraft Crew Remarks 395 23 January11:49 7 hours, 24 minutes 19:13 Replacement of Latching End Effector-B (LEE-B) for the Space Station Remote Manipulator System (SSRMS) 396 2 February15:34 8 hours, 13 minutes 23:47 ISS Pirs Remove and replacement of an electronics box for a high-gain communications antenna on the Zvezda service module 397 16 February12:00 5 hours, 57 minutes 17:57 Finished removal and replacement of Latching End Effector on POA, Replaced LEE Camera, Installed Ground Strap on Canadarm2, Brought failed LEE inside, Lubricated Canadarm2, Moved Tool Platform on Dextre, Adjusted Struts on Flex Hose Rotary Coupler. 398 29 March13:33 6 hours, 10 minutes 19:43 Installed two Wi-Fi antennas on the Node 3 module in preparation for the arrival of ECOSTRESS on SpaceX CRS-15, removed ammonia jumpers and inspected two working jumpers on the stations truss, replaced camera and lights used to film NASA TV 399 16 May11:39 6 hours, 31 minutes 18:10 Transferred a Pump Flow Control Subassembly over to Dextre stowed failed PFCS on ESP-1, Replaced camera and lights used to film NASA TV, Replaced Space to Ground Transceiver Controller, Performed get aheads to Install handrails on Radiator Grapple Bars on S1, Removed thermal blankets and MLI from two Direct Current Switching Units on ESP-2, Prepped the Flex Hose Rotary Coupler on S1 for replacement. Spacewalk suffered a 7-minute delay because of a water leak which formed ice crystals inside the airlock. 400 14 June13:06 6 hours, 49 minutes 19:55 Feustel and Arnold installed new high-definition cameras near IDA 2 mated to the front end of the station's Harmony module. The additions will provide enhanced views during the final phase of approach and docking of the SpaceX Crew Dragon and Boeing CST 100 Starliner commercial crew spacecraft that will soon begin launching from American soil. The astronauts also swapped out a camera assembly on the starboard truss of the station used to film NASA TV and closed an aperture door on the CATS experiment outside the Japanese Kibo module in preparation for disposal on SpaceX CRS 15 and replacement by its successor, ECOSTRESS. Get aheads involved relocating an adjustable grapple bar to the S1 Truss and securing the Flex Hose Rotary Coupler in preparation for replacement on the next spacewalk. During the spacewalk Feustel beat Jerry Ross, his STS 125 crewmate John Grunsfeld, Fyoder Yurchikhin, and Peggy Whitson to become third on the list of all time space walkers. 401 15 August16:17 7 hours, 46 minutes 00:03 on 16 August Expedition 56 ISS Pirs Deployed four CubeSats built by Russian students Installed antennas and cables for the Icarus animal-tracking device Retrieved two materials exposure packages from the Zvezda hull 402 11 December15:59 7 hours, 45 minutes 21:44 Expedition 57 ISS Pirs Inspected damage to the hull of Soyuz MS-09. Retrieved external science experiments.
2019 spacewalks
# Start date/time Duration End time Spacecraft Crew Remarks 403 22 March12:01 6 hours, 39 minutes 18:40 Connected 3 new Li-ion batteries to replace 6 old Ni-H batteries on power channel 4A of the P4 truss segment. Cleaned up debris on Unitys common berthing mechanism using Kapton tape. Secured a tieback for restraints on the solar array blanket box. 404 29 March11:42 6 hours, 45 minutes 18:27 Connected 3 new Li-ion batteries to replace 6 old Ni-H batteries on power channel 2A of the P4 truss segment. Disconnected cables and relocated an adapter plate to enable Canadarm2 to remove a failed Li-ion battery. 405 8 April11:31 6 hours, 29 minutes 18:00 Installed jumper cables between the Unity module and the S0 truss to establish redundant power to Canadarm2. Installed cables to provide for more expansive wireless communications coverage outside the orbital complex. Relocated an adapter plate from the 22 March spacewalk in preparation for future battery upgrade operations 406 29 May15:42 6 hours, 1 minute 21:43 Removed experiments from the Pirs docking compartment and cleaned the windows.