The Montézic Power Station (French: Centrale de Montézic) is a pumped-storage power plant near the commune of Montézic in northern Aveyron, France."Lot et Truyère : Bruxelles met la pression sur EDF en Aveyron". Centre Press Aveyron Its 910-megawatt capacity ranks it second among France's main pumped-storage facilities, and is the only one situated on the Massif Central.
Montézic is a pure pumped-storage plant, which means that its upstream reservoir receives little to no natural inflow of water. The station has a weekly time cycle."Moyens d'estimer la valeur économique des installations de transfert d'énergie par la simulation mathématique d'exploitation. Application de ces données à l'aménagement et au choix des sites". La Houille Blanche, Number 6-7 (Octobre 1972 P. Gérard
History The construction of the power station started in 1976, and it was commissioned in 1982."Geological and geographical criteria for underground siting of nuclear reactors". Geostock, P Duffauta The following are some key dates from this period:
In August 1976, the power station's access tunnel was bored, and between November 1977 and July 1978, grading work for the plant, the connecting tunnels, and the dams was carried out. In July 1979, assembly of the turbine generators took place.
In May 1981, the Etang Dam (Barrage de l'Etang) was completed, and from June to August, the upper reservoir was filled. October 1981: Completion of the Monnès Dam (Barrage de Monnès). January 1982: Filling of the penstock tunnels. April 1982: Commissioning of turbine assembly 1 June 1982: Commissioning of turbine assembly 2 October 1982: Commissioning of turbine assembly 3 December 1982: Commissioning of turbine assembly 4
Operation The power station was built by the electric utility company Électricité de France (EDF, Electricity of France), which operates it under a concession agreement."EDF met en lumière ses nombreuses actions". La Depeche, 14 March 2013
Reservoirs The power station receives water from an upper basin, the Montézic Reservoir, whose active capacity is . Two rock-fill embankment dams form the reservoir: the Monnès Dam, long and high the Etang Dam, long and high Under normal conditions, the Montézic Reservoir sits at a elevation and covers a surface area of .
Due to the fluctuating water level, the reservoir is unsuitable for leisure activities. In order to remedy this problem, EDF created the Saint Gervais Lake (Lac de Saint Gervais) through the installment of another embankment, providing a stable body of water for the promotion of aquatic tourism.Pêche en Viadène (Fishing in Viadène) blog
The lower basin was already in existence as a result of the Couesques Dam, a arch dam on the Truyère River built between 1945 and 1950. This reservoir holds a volume of .
The Montézic power station utilizes a water volume of . If the four turbine generator assemblies are in pump mode, the Couesques Reservoir can be emptied in 40 hours. Both the turbine and pump modes are used on a regular basis.
Penstocks The penstocks are in diameter and in length. They carry water from the upper reservoir to the power station through the high-pressure tunnel."Hydroélectricité : les élus en terre aveyronnaise". Sud Ouest, 13 July 2013 Jean Toutu The water intake, located on the Liaussac Embankment (next to the Monnès Dam), has two sluice gates, which allow the high-pressure tunnel to be closed off. Once the water has passed through the turbines, it is evacuated through the low-pressure tunnel towards the Couesques Reservoir.
Power station The Montézic station lies under the earth, dug out of granite. It has all of the electrical and hydraulic equipment necessary for the operation of its four turbine-pump assemblies, which are each capable of generating 230 MW in turbine mode and consuming 210 MW in pump mode, and permit the transfer of energy between the upper Montézic Reservoir and the lower Couesques Reservoir. The generator's 18 kV of power are raised to 400 kV by 250 MVA transformers and then sent on to the Ruyères Substation.
The 22 MW static frequency converter (SFC) is used to launch the turbines in pump mode. It performs a progressive increase in speed (from 0 to 428 rpm) as well as the coupling of the pumps to the power grid. Made up of an array of thyristors, the converter enables a gradual start-up by varying the frequency and thus the speed of the machines. When the synchronization speed is reached, the turbine-pump assembly can be coupled to the grid. The start-up phase is performed dry, with no load.
Each machine has a flow rate of in both directions. The pump-turbines are located below the maximum level of the Couesques Reservoir, which is below the minimum level. This placement is essential to prevent the cavitation in the intake tunnel.
As one of France's pumped storage facilities, known as STEP (Station de transfer d'énergie par pompage), Montézic plays a key role in the supply of the French power grid, as it provides a way to quickly restore electricity during a blackout.
See also
List of power stations in France Electricity sector in France Renewable energy in France List of largest hydroelectric power stations Hydropower