Line 3 of Ningbo Rail Transit () is a rapid transit line in Ningbo. It starts from south Fenghua District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District. The construction of the first section, from south Yinzhou to Datong Bridge, started on 23 December 2014.
Route Line 3 starts from Jinhai Road station as an elevated line. It goes north behind the Airport Road until Chaoyang station and turns into east direction on Yanhu Road to Shishan station. Then it turns north again and underground into Gaotang Bridge Station. Then it turns into east–west direction on Yinzhou Avenue and makes a further turn into Ningnan South Road and goes in north–south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses the Ningbo–Taizhou–Wenzhou railway from which it goes in north–south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.China Railway Siyuan Survey and Design Group, Environment impact report of Line 3, Ningbo Rail Transit, Wuhan, February, 2014
Phase 2 of line 3 will have 5 more stations north of Datong Bridge, but due to restrictions of an old airport, part of the phase 2 between Datong Bridge and Yongmao Road is stalled for construction. The rest 3 stations of phase 2 has started construction since 2 December 2019, and will temporary run as a part of line 5. Test run of phase 2 of line 3 started on 1 February 2024.
Opening timeline SegmentCommencementLengthStation(s)Name Datong Bridge — Gaotang Bridge 30 June 2019 15 Line 3 (Phase 1) Gaotang Bridge — Minghui Road 28 September 2019 3 Yinfeng Section Minghui Road — Jinhai Road 27 September 2020 6Luotuo Bridge — Yongmao Road28 June 20243Phase 2, now temporarily run as a part of Line 5
Stations
Phase 1 Service routes Station name Connections Distance LocationLocalRapid ••• 0.00 0.00 Jiangbei••• 1.72 1.72 Yinzhou••• 1.26 2.98••• 0.98 3.96••• 0.96 4.92••• 1.19 6.11••• 0.98 7.09••• 1.43 8.52••• 0.97 9.49••• 1.17 10.66••• 0.74 11.40••• 1.33 12.73•• 1.25 13.98•| 1.34 15.32•| 0.82 16.14•• 1.7317.87•| 1.3519.22•| 1.3120.53•| 1.8822.41•• 4.4626.87 Fenghua•| 2.5829.45•| 1.61 31.06•• 4.04 35.10•• 2.3537.45
Phase 2 See Line 5 (Ningbo Rail Transit)#Stations.
References