Haojia Fu station () is a station on Line 6 of the Beijing Subway. It is located in Lucheng, Tongzhou District. Construction began on September 20, 2012.
The station was opened on December 28, 2014. The station was temporary closed on October 11, 2017, due to road construction. It was reopened on November 9, 2018.YNet news
Station layout The station has an underground island platform.
Exits There are 4 exits, lettered A, B, C, and D. Exits A and C are accessible.
Gallery
References